YEJ Series Three Phase magnatic motor

FOB Reference Price:Get Latest Price
1 Piece/Pieces (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
China
Brand Name:
Eastop
Model Number:
Frame 80-355, 2/4/6/8Pole
Output Power:
O.75KW/1HP--315KW/559HP
Type:
Induction Motor
Frequency:
50/60Hz
Phase:
Three-phase
Certification:
CCC, CE, UL
Protect Feature:
Totally Enclosed
AC Voltage:
380/660V
Efficiency:
IE 2
Housing:
Cast Iron
Windings:
100% new Copper Wire
Protection Grade:
IP54 IP55
Insulation Class:
F
Speed:
2900RPM 1400RPM 960RPM 660RPM
Duty:
S1
Cooling Method:
IC411
Color:
Blue, Gray, Yello and so on
Supply Ability
Supply Ability:
800 Piece/Pieces per Day
Packaging & Delivery
Packaging Details
Carton with foam for 80-100Frame motor; 112-132 frame motors with Plywood cases; 160 and above with Wooden Cases. Cartons and Plywood cases packing could be in PALLET as your wish. We always ship by 20feet container.
Port
China
Lead Time :
25Days after receipt of deposit for 1*20feet container goods

Specifications

1.Lowest prices. 2.Perfect finishing 3.100% Copper wire,100%output 4. Short delivery time 5. 1 year quality warranty

General Introdution:

    1.YEJ electromagnetic brake asynchronous motor is widely used in all kinds of machines that requires quick brake ,precise locating , repeat operation,frequent starting and brake. All these machines are applied to main drive and auxiliary preach. Such as electric valve ,rubber chemical machinery, metal working machine ,packaging machine ,wood working machine,food machine ,chemical machine ,weaving machine ,building machine ,and gear reducer etc.

     2.Ambient temperature: -15 °C -40 °C .   Altitude should be higher than 1000metres above sea level.

Connection: Y star-connection for 3kw and less power motors; Delta-connection is for above power motors. The temperature rise of the stator winding is examined at 80K.

Detailed Specifications:

 

Mounting Mode:

 

FAQ:

 

Q: Do you offer OEM service?

A: Yes

 

Q: What is your payment term?

A: 30% T/T as deposit in advance, 70% balance receipt of the copy of B/L or before shipment.

 

Q: What is your lead time?

A: About 25 days after receipt the deposit or original irrevocable L/C.

 

Q: What certifiicate do you have?

A: We have CE, ISO. And we can apply for specific certificate for different country such as COI for Iran, SASO for Saudi Arabia, etc.

 

Our Production:

 

Our Packing:

Our Loading: 

 

                  Your Smile is Our Support!