Sign in
Sign up
All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier
High voltage load bank 3500kw resistive load bank for power plant loading testing
No reviews yet
Hebei Kaixiang Electrical Technology Co., Ltd.
Custom manufacturer
11 yrs
CN
Key attributes
Industry-specific attributes
Warranty
1 Year
Power
3500kW
Other attributes
Customized support
OEM
Place of Origin
Hebei, China
Brand Name
Triumph Load
Model Number
3500kw resistive load bank
Color
according to customers'prefer
Rating Voltage/Frequency
AC11kv 50hz
PF(Power Factor)
1
Load Tolerance(overall)
±3%
Control Power
External ac 380v /50Hz/60hz
Dimension
About 9150mm*2350mm*2591mm
Ambient Temperature
-20℃~+50℃
PLC
Siemens
Function
For generator testing
cooling type
axial fan
Packaging and delivery
Packaging Details
About 9150mm*2350mm*2591mm
Selling Units:
Single item
Single package size:
10X10X10 cm
Single gross weight:
50.000 kg
Show more
Lead time
Quantity (sets)
1 - 1
2 - 5
> 5
Lead time (days)
15
15
To be negotiated
Still deciding? Get samples first!
Order sample
Samples
Maximum order quantity: 1 set
Sample price:
$63,000.00/set
Order sample
Customization
Customized logo
Min. order: 1
Customized packaging
Min. order: 1
Graphic customization
Min. order: 1
For more customization details,
message supplier
Product descriptions from the supplier
1 - 29 sets
$120,000.00
>= 30 sets
$90,000.00
Variations
Total options:
Select now
Shipping
Start order
Add to cart
Still deciding? Get samples first!
Order sample
Samples
Maximum order quantity: 1 set
Sample price:
$63,000.00/set
Order sample
Membership benefits
Quick refunds on orders under US $1,000
View more
Protections for this product
Delivery via
Expect your order to be delivered before scheduled dates or receive a 10% delay compensation
Secure payments
Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols
Refund policy
Claim a refund if your order doesn't ship, is missing, or arrives with product issues