All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

NEW 12V Diesel Fuel Transfer Pump 40L Automatic Nozzle Hose

No reviews yet

Key attributes

Industry-specific attributes

Application
Other, Automotive Industry, Biofuel Industry, Commercial Buildings, District Energy, Family Homes, Industrial Boilers, Industrial Utilities, Irrigation and Agriculture, Machining, Marine, Metal and Equipment Manufacturers, Mining industry, Pharmaceutical industry, Raw Water Intake, temperature control, Wastewater Transport and Flood Control, Water Distribution
Pressure
Normal
Voltage
12V, 24V, 110V, 220V

Other attributes

Customized support
OEM, ODM
Place of Origin
Zhejiang, China
Power Source
Electric
Structure
PISTON PUMP
Warranty
12 months
Brand Name
AOCHENG
Model Number
DCFD40
Horsepower
155w
Cable Length
2m
Outlet Size
3/4"
Power
155W
Power
Electric
Standard or Nonstandard
Standard
Color
Blue red yellow black
Fuel
diesel, gasoline, Bio-Diesel

Packaging and delivery

Packaging Details
1 pcs in 1 master carton.
Selling Units:
Single item
Single package size:
34X30X40 cm
Single gross weight:
12.500 kg

Lead time

Quantity (pieces)1 - 12 - 100 > 100
Lead time (days)315To be negotiated
Still deciding? Get samples first! Order sample

Samples

Maximum order quantity: 1 piece
Sample price:
$65.00/piece

Customization

Customized logo
Min. order: 100
Customized packaging
Min. order: 100
Graphic customization
Min. order: 100

Product descriptions from the supplier

20 - 99 pieces
$65.00
100 - 499 pieces
$56.00
>= 500 pieces
$52.00

Variations

Total options:

Shipping

Still deciding? Get samples first! Order sample

Samples

Maximum order quantity: 1 piece
Sample price:
$65.00/piece

Membership benefits

Quick refundsView more

Protections for this product

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Refund policy

Claim a refund if your order doesn't ship, is missing, or arrives with product issues