All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

axtd tube iron /steel 47mm steel galvanized pipe price per kg

No reviews yet

Key attributes

Industry-specific attributes

Section Shape
Square
Surface Treatment
Hot Rolled
Tolerance
±5%, ±1%, ±10%
Oiled or Non-oiled
Non-oiled
Invoicing
by theoretical weight

Other attributes

Place of Origin
China
Alloy Or Not
Non-Alloy
Standard
JIS
Technique
ERW
Grade
Q195~Q355,SS400,ASTM GRA/GRB,S235~S55
Delivery Time
7-15 days
Brand Name
AXTD
Application
Structure Pipe, Other
Special Pipe
Welded Pipe, galvanized square tube
Thickness
0.5 - 25 mm
Length
12M, 6m, 6.4M, Max 16m
Certificate
ISO9001
Processing Service
Bending, Welding, Punching, Cutting
Product name
hot dipped galvanized Square Steel Pipe
Brand
AXTD
Key word
welded square steel
Surface
Customers't Requirement
Ends
Plain end, cutting etc
Type
Hot Rolled Hollow Carbon Pipe
Length
0.5~16M
Technology
Hot Expanded
MOQ
5 Tons
Payment terms
L/C at sight, T/T

Packaging and delivery

Selling Units:
Single item
Single package size:
100X0.1X0.1 cm
Single gross weight:
1.500 kg

Lead time

Quantity (metric tons)1 - 1516 - 25 > 25
Lead time (days)2015To be negotiated
Still deciding? Get samples first! Order sample

Samples

Maximum order quantity: 1 metric ton
Sample price:
$750.00/metric ton

Product descriptions from the supplier

5 - 49 metric tons
$620.00
>= 50 metric tons
$520.00

Quantity

Shipping

Shipping solutions for the selected quantity are currently unavailable
Item subtotal (0 variations 0 items)
$0.00
Shipping total
$0.00
Subtotal
$0.00
Still deciding? Get samples first! Order sample

Samples

Maximum order quantity: 1 metric ton
Sample price:
$750.00/metric ton

Membership benefits

Quick refundsView more

Protections for this product

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Refund policy

Claim a refund if your order doesn't ship, is missing, or arrives with product issues