Packing for sliding glass window
Step 1.Protective tape protects frames from scratches;
Step 2.Keep windows fixed on iron pallets;
Step 3.Tie up windows on the iron pallets with plastic belts;
Step 4.PE films keep windows away from sea water;
Step 5.Fill in the space between each two iron pallets by air bags;
Step 6.Tie up iron pallets in container with plastic belts.
Our packages will ensure the windows arrive at project jobsite in good conditions.
Port
Shanghai Port
Selling Units:
Single item
Single package size:
40X15X40 cm
Single gross weight:
30.000 kg
Supply Ability
Supply Ability
30000 Square Meter/Square Meters per Month sliding glass window