precast design ready made light steel structure building/steel structure workshop/alibaba shop prefabricated steel structure

FOB Reference Price:Get Latest Price
$48.00 - $69.00 / Square Meters | 10 Square Meter/Square Meters alibaba shop prefabricated steel structure (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China
Brand Name:
steel structure workshop
Model Number:
precast design ready made light steel structure building
Application:
Exhibition,Hotel, House, Office, Toilet, Plant, Workshop, Warehouse
Type:
Steel structure workshop
Color:
Customized
Steel grade:
Q235 or Q345
Material:
Steel structure, sandwich panel, Q235 or Q345
Frame:
Columns and beams
Columns and beams:
H section steel
Certificate:
ISO9001, CE, TUV, SGS
System:
Steel Profiles Construction
Wall and Roof:
Glass Wool
Supply Ability
Supply Ability:
3000 Square Meter/Square Meters per Day alibaba shop prefabricated steel structure
Packaging & Delivery
Packaging Details
precast design ready made light steel structure building/steel structure workshop/alibaba shop prefabricated steel structure of Packing for steel structure warehouse: Nude packed,or as you like
Port
Shanghai,
Lead Time :
within 15days-20days

precast design ready made light steel structure building/steel structure workshop/alibaba shop prefabricated steel structure

Product Overviews

 

Material Standards:
1. International standard: Fe360B
2. Chinese standard: Q235B/ Q345B
3. European standard: A37-2
4. Japanese standard: SAPH38(G3133-87)
5. American standard: A283GRC
Function:
Beam, column used as various steel structure beam and column on workshop, warehouse, office building and power plant
Coating:
1. Painting:Alcohol acid paint, epoxy zinc rich paint and chlorinated rubber paint. Various color  available.
2. Hot dip galvanizing: The hot dip galvanizing thickness is about 60~120 microns and  275~500g/square meters

 

Advantage

1.Precision works, long life-span for use

2.Lightness, easy to transport and relocate

3.High strength and stiffness, high weight bearing

4. Waterproof and fireproof

5.Antisepsis and damp proofing

6.Sound insulation and heat insulation

7.Using several times and recycling, economy and environment friendly

 

Main steel
1steel beam columnQ235,Q345
Secondary steel

1

Tie BarQ235
2PurlinC and Z purlin
3BracingQ235
Maintenance system
1Roof SheetCorrugated steel sheet, EPS sandwich panel, rockwool sandwich 
panel, PU sandwich panel
2Wall SheetCorrugated steel sheet, EPS sandwich panel, rockwool sandwich 
panel, PU sandwich panel
Accessories
1WindowAluminiumn Alloy, PVC, Sandwich Panel
2Door

Roll up door, Sandwhich panel sliding door, personal door

Our products mainly engaged 5 parts. 1st steel structure factory/warehouse/workshop;2nd Light steel villa, office, dormitory;3rd prefab house, module building;4th Container house, flat pack mobile house;5th customized non-standard buildings. For now we have established long-term partnership with clients from New Zealand, Australia, Uruguay, Spain, Myanmar, Nepal, Congo, Nigeria, Colombia, India, New Caledonia and many others. 
Due to our advanced management, excellence mechanism, effective and efficient resource integration system, low-cost expansion capability, high-tech core technology and advantages of global marketing network, all that makes our company laid the cornerstone of sustainable development. 

FAQ

Q1: Could you please design a new and unique light steel prefab house for me?

A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but landscape design! Besides, detailed drawings and 3D models are surely included. One-stop service is our outstanding superiority with no doubt.

 

Q2: What should I provide to build a light steel prefab house?

A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don’t have any. Simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you’ll possess an amazing design.

 

 Q3: How could I ensure the cost of building a light steel prefab house?

A: Firstly, the designing scheme should b e accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation. 

 

Q4: How Long does it take to build a light steel prefab house?

A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.

 

Related Products

      

     FOLD UP  HOUSE                     STEEL STRUCTURE SHED                        VILLA                                 CONTAINER HOUSE

 
You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like