rectangular steel tube making machine ERW automatic pipe mill line

FOB Reference Price:Get Latest Price
  • 1 - 1 Sets
    $120,000.00
  • >=2 Sets
    $50,000.00
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Type:
Pipe Mill
Pipe Material:
Carbon Steel
Application:
Drain Pipe
Production Capacity:
80%
Place of Origin:
china
Brand Name:
KingJime
Power(W):
300
Certification:
CE,ISO
Product name:
rectangular steel tube making machine ERW automatic pipe mill line
Model Number:
KJ25
coil thickness:
0.4-1.2mm
pipe diameter:
8-30mm
line speed:
30-100m/min
high frequency power:
100KW
control system:
Siemens PLC
After-sales Service Provided:
Engineers available to service machinery overseas
Warranty:
one year
Supply Ability
Supply Ability:
4 Set/Sets per Month
Packaging & Delivery
Packaging Details
wooden packing
Port
shenzhen port china
Video Description
Product Description

 

Main Technical datas for rectangular steel tube making machine  ERW automatic pipe mill line :

1.

application

carbon steel,galvenized steel

2.

Thickness of coiled plate

0.4-1.2mm

3.

pipe diameter

8-30mm

4.

Slitting speed

20-100m/min

5.

Loading capacity 

2T

6.

Coil I.D

508mm

7.

Coil O.D

≤1500mm

8.

Slitting shaft diameter

 180

9.

cutting accuracy

 ±3mm

10.

Direction of feed material

from Right to Left or Left to Right(customized

11.

Power Supply

customized

LIST OF EQUIPMENTS UNDER SCOPE OF SUPPLY for rectangular steel tube making machine  ERW automatic pipe mill line:

1.      Decoiler 

2.      Shear and butt welder

3.      Cage type accumulator                                                                 

4.      Forming,Welding,Sizing main machine               

5.      Computer saw

6.      Pipe table

7.     High frequency welder

 

Company Information

 Kingjime machine Limited is a TaiWan of Chinese technological enterprise manufacturer with Japanese technology to make steel coil cut to length line ,slitting line ,High Frequency pipe mill machine,feeder machine .We owned National high and new technology enterprise with 40 patents and intellectual property rights over the last for years.welcome to kingjimemachine as they!
we have established steady cooperation with customers in over 58 countries

 

customers

 

 

exhibitions

 

 

Certifications

 

 

Packaging & Shipping

 

1.    Package: Machine devices will be Naked and all the roller parts will be antirust             treatment to protect the rollers. All the spare parts will be collected into the homemade steel boxes.spare parts in wooden packing.

2.    Delivery: 60-120 days

3.    Container: 2x40HQ and 1x20GP

4.    Shipping: All the parts in the containers will be strengthened with the container to prevent the deveices from being slipped

 

 

Our Services

 

 Step1:   know what machine you need

 Step2:   design the specific technical plan as per your request

 Step3:   Discuss and negotiate

 Step4:   Sign contract and place order

 Step5:   arrange production

 Step6:   Finish the production and inspect machine

 Step7:   Shipping

 Step8:   Apply visa for installation engineers 

 Step9:   Install machine and teach your operators

 Step10: After-sale service

FAQ

 

(1) What is your advantages?

A1:More than 20 years experience in manufacturing the machines. Professional and rich experienced..

A2:We are a manufacturer, not the trading company. So we can provide the strong and powerful service before and after sales.

A3: Can produce 4 lines per month 

(2) Do you have after sales support?

Yes, We have a 25-person -professional and strong installation team. And Will provide the machine life time service for you. Any problem , contract us and we will solve for you.  

(3) How to visit your company?

Our factory is located in Dongguan city, near HongKong,Shenzhen and Guangzhou. So there are two ways to our factory. One is by flight, direct from HongKong or Shenzhen or Guangzhou Airport. Another is by fast train, from Guangzhou East train station to Zhang Mu Tou train station. We will pick you up at the train station or airport

(4) What information you need to prepare the quotation:

1. coil thickness(min-max)

2. pipe diameter(min-max)

3. what kind of your material

4. weight of your coils(max)

6. how many tons you need per day or per month