scaffolding Steel Catwalk for Construction Steel Plank Scaffolding Walk Board sgs tested

FOB Reference Price:Get Latest Price
  • 1000 - 1999
    US $12.20
  • 2000 - 2999
    US $11.90
  • 3000 - 3999
    US $11.50
  • >=4000
    US $11.20
Supply Ability:
10000 Ton/Tons per Month
Port:
Tianjin
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Gainford
Model Number:
CW001
Type:
Pre galvanized steel plank
Material:
Q195~Q235
Surface Treatment:
Pre-galvanized
Width:
210/225/240/250/420/480/500
Thickness:
1.1~2.0mm
Standard:
EN12811
Certificate:
SGS
Application:
Construction
Packing:
Bundle
OEM:
Available
Packaging & Delivery
Packaging Details
In bundles, suitable container shipment.
Delivery Time
1 week
Product Description

 

Scaffolding catwalk steel galvanized platform plank with hook is the main part of pipes & coupler scaffolding system. Pre-galvanized surfaces treatment provided the excellent appearance with sufficient durability in such applications where salty air or long-term weather exposures are inevitable.

 

Standard Size

 

WIDTH

(MM)

HEIGHT

(MM)

LENGTH

(MM)

THICKNESS

(MM)

HOOK(MM)

210

45600-21001.0-2.043/50
22538600-21001.0-2.043/50
24045600-21001.0-2.043/50
25040600-21001.0-2.043/50

250

50600-21001.0-2.043/50
30050600-21001.0-2.043/50

420

45600-21001.0-2.043/50
48045600-21001.0-2.043/50
50050600-21001.0-2.043/50
60050600-21001.0-2.043/50
Remarks: All items can be customized as per cutomers' requirements.

 

 

Packaging & Shipping

Packing

 

We offer the packing according to the customer requirement. The most popular packing is in bundles.

 

Our Services

 Why us?

 

· Years production experience with extraordinary quality.

· Qualified inspection group inspect each production step.

· Professional engineer offers suggestions for customer's project.

· OEM service is available.

Company Information

 

Factory

 

 

Certification

 

Related Products

 

   

   

FAQ

 

1. Q: What's your MOQ(minimum order quantity)?

    A: One full container.

 

2. Q: What's your packing methods?

    A: Packed into bundle, and rest in bulk.

 

3. Q: What's your payment terms?

    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.

 

4. Q: What's your delivery time?

    A: 10-20 days after received the advance payment or L/C.

 

5. Q: Are you manufacturer or trader?

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.

 

6. Q: Where's your factory?

    A: Our factory is in Dongguan city (near Shenzhen) and Tianjin city (ner Beijing)

 

7. Q: Can we visit your factory?

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

 

8. Q: Can you supply other scaffolding materials?

    A: Yes. All related scaffolding materials.

        (1) scaffolding system (ring lock system, frame, pipe&coupler system)

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

        (4) steel coupler (preesed / drop forged)

        (5) steel plank with / without hooks

        (6) steel stair case

        (7) screw adjustable base jack

        (8) adjustable props

 

Thank you.

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like