stainless steel 304 brewhouse system for brewery equipment

FOB Reference Price:Get Latest Price
$1,000.00 - $50,000.00 / Sets | 1 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Processing:
Fermenting Equipment
Condition:
New
Place of Origin:
Shandong, China (Mainland)
Brand Name:
HAOLU
Model Number:
HL-30BBL
Processing Types:
beer
Voltage:
3phase/380(220,400,415,440)V/50(60)Hz
Power(W):
15-70KW
Dimension(L*W*H):
user requirement
Weight:
various in different capacity
Certification:
CE/ISO9001:2000/ROHS
material:
SUS304/SUS316/Red copper
color:
mirror SUS/Luxury red copper/Brushed SUS
Insulation:
polyurethane or rockwool with thickness 80-100mm
raw materials:
wheat,barley
cooling:
glycol
cooling way:
water belt/miller board
heating method:
electric/steam/gas
fitting:
food grade
inner polishing precison:
0.4 micrometer
plants type:
turnkey or customerized
After-sales Service Provided:
Engineers available to service machinery overseas
Warranty:
2 years
Supply Ability
Supply Ability:
30 Set/Sets per Year
Packaging & Delivery
Packaging Details
standard exporting package
Port
Qingdao

50BBL 100BBL stainless steel 304 mash tun brewhouse system for brewery equipment

Company Information

 

1.Company Introduction:

   We Jinan Haolu Machinery Co., Ltd was established in 2000,located in the beautiful Spring City-Jinan.It is the most influential and professioanl beer equipments company in China which integrates with R&D, Productiuon and Sales.We are professional in making the beer machinery,fermentation machinery,saccharication and so on.We have the technological engineers that have the rich experiences,best after-sales services and professional producing craft.

Very suitable for India,Australia,Iran,UK ,Middle East and foreign markets

 

Product Description

 

2.The main configuration of the complete brewery production line:

 Milling system      Saccharification system      Fermentation system 

Refrigeration system    CIP Washing and sterilization system Control system

Filling and washing Equipment

 

3.Mash Tun Introduction:

It is designed for mashing and boiling of wort with hops. It has a mixing machine, driven by an electric motor (P=2.0KW, 380V). The device has heating steam jacket which covers the lower part of the device and its bottom. Mash tun is thermally insulated with urethane plastic foam. Temperature sensor located in the cylindrical part of the apparatus.

 

 Working volume: 50BBL; with 25% head space;

Steam jacket

Thickness of insulating layer: 100mm; Inner Body Thickness: 3mm, outer shell is 2mm

Top mounted manway with full glass; Light fixture with LED;

CIP rotary spray device; mixer with motor; Bottom wort collect;

Bimetal thermometer and temperature probe

Outer and Inner plate protection , and ribbon polished on all welds

All valves are stainless steel, which attaches with tri-clamps;

With all matched valves and accessories. 

 

 

 

3.Technological specification:

 

Outside surface

Stainless steel or red copper,THK:1.5mm-3mm

Inner surface

S.S.304,THK:2mm-4mm

Top shape

Seal head or conical head

Heating method

Steam

Insulation layer

Protected by polyurethane,THK:70-100mm

Polishing

≤0.4µm

Manhole

Side upward or your requirements

Plate heat exchanger

4m²

Agitator

Raking system conneted into a top reducer

 

The output of Beer making machinery pls as a reference:

daily output

100L

200L 

300L 

500L

600L

800L

1000L

2000L

3000L

5000L

unit type

HL100

HL200

HL300

HL500

HL600

HL800

HL1000

HL2000

HL3000

HL5000

floor space

15m²

20m²

25m²

45m²

55 m²

70m²

80m²

120m²

150m²

250m²

power

8KW

12KW

20KW

35KW

35/15KW

35/15KW

35/15KW

65/15KW

65/15KW

65/15KW

Beer production period

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

 

4.Technical parameters & relevant services

1. Output: 300 L/Batch

2. Square for work shop: 25 m2 and 2.5 m high

3. Installed Capacity: 20 Kw

4. Voltage / Frequency (3 phase): 380V / 50Hz or we can design it according to your actual requires.

5. Workers Required: 1-3 Workers

6. Warranty: At least 5 year from the date of completion of the commissioning.

7. Installation/Operation/ Service/ Maintenance Manual: Provided In English

 

PRE-SHIPMENT INSPECTION INCLUDES

a). Supplier should examine whole line at supplier’s factory before shipment;

b). Supplier has to guarantee each equipment’s quality;

c). All raw materials will be provided if the customer need for charging suitable fees.

EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES

a). Free consultation service before, during, and after sales;

b). Free project planning and design services;

c). Free debugging of equipment until everything is functional;

d). Free management of equipments' long distance shipping;

e). Free training of equipment maintenance and operating personally;

f). Free new production techniques and formulas;

g). Provide 2 year complete warrantee and life-time maintance service;

INSTALLATION SUPERVISION AND COMMISSIONING-Including salaries based on 40 hours per week as well as accident-and health insurance for:

1 Engineer for the duration of two or three weeks in total.

And he will install and debug the equipment. Give the workers guiding and technical training.

 

Period of installation:

The total length of the installation time depends on customer cooperation degree and site condition. A possible delay of the installation period will be additionally invoiced.

Success Project:

 

 

Production Process

 

 

Packaging&Shipping

Wooden/Veneer case for LCL or as your require

 

Plastic film wrapped and iron frame fixing for FCL or as your require

 

 

 

Our Services

1.Make the equipment details specifications to customers.
2.We can supply the OEM process,according to the drawings,the samples to customized the beer equipment
3.Layout plan in CAD drawing.
4.The competitive price and the timely delivery
After-sale service:
1.Provide the required customs declaration files,timely tracking freight.
2.The equipment main configurations for 2 years warranty time,such as the valves and so on
3.Professional engineers for installation,commissioning,maintenance
4.Directed by executable remote installation(with no experience in beer,equipment installation experience,can also perform operations,please make this clear before custom equipment,we have successful cases.

 

 

FAQ

Why choose us:

 

1.Specialist manufacturer

We have own factory. We get CE certification.We specialize in manufacturing beer brewing equipment.

 2.Quality and price

We have professional purchasing team. Comparing multiple vendors,choose 

best raw materials and the most preferential price.We have skilled worker and 

strict quality control system,provide the best quality products to our customers.

3.Convenient transportation

Our company is located in Jinan City, Shandong province, ,which is near Qingdao port. It just take 3 hours from Jinan to Qingdao port.

4.Clear order process

We have clear order process. From mails &calling→→Order confirmed→→Make advance payment→→Workshop produce→→Pay the balance→→ Arrange goods delivery→→Buyers receiving confirmation→→Satisfaction survey.

 5.Quality of service

We will provide photos make our customers to know the order status.Of course,we welcome our customers to our factory to inspect any time!

 

 

Certifications

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like