stainless steel sheet metal laser cutting riveting sheet metal fabrication nashville tn leeds greensboro nc galway thomastown

FOB Reference Price:Get Latest Price
  • 1 - 99 Pieces
    $10.50
  • 100 - 999 Pieces
    $9.45
  • >=1000 Pieces
    $7.50
Shipping:
Support Express · Sea freight
Lead Time:
Quantity(Pieces) 1 - 10 >10
Est. Time(days) 15 Negotiable
Customization:
Customized logo (Min. Order: 1 Pieces)
Customized packaging (Min. Order: 1 Pieces)

More

Graphic customization (Min. Order: 1 Pieces) Less
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Taiwan, China
Brand Name:
OEM/ODM/Manufature
Material:
aluminum
Process:
Laser Cutting Bending Stamping
Surface treatment:
powder coated
Application:
Industry
Service:
Customized OEM
Type:
OEM Parts
Size:
Client's Drawings
Certificate:
ISO9001,ISO14001
Color:
Customized Color
Drawing Format:
3D/CAD/DWG
Packaging & Delivery
Packaging Details
Carton+pallet+Bubble wrap
Port
Kaohsiung Port
Lead Time :
Quantity(Pieces) 1 - 10 >10
Est. Time(days) 15 To be negotiated
Product Detail

 

FAQ

 

 1.  Q: How are prices and customs fees calculated?

A: Will be adjusted according to the order quantity and product size

 

 2.  Q: Can it be made in small quantities?

          Can there be a large number of urgent orders  ?

A: Professional division of labor and adherence to a consistent production model is TAIWA’s greatest competitiveness. In addition, all standard operating procedures have passed ISO certification. It has first-class standards in quality and operation mode. Compared with other factories, it can produce more in emergency orders. It does not matter if it is 1 pcs or requires 10000pcs, it can be made. Customized sheet metal processing and proofing are also welcome.

 

  3. Q: Do I need to pay a deposit in advance?

A: When quoting, the price, freight and payment method will be informed first. Customers who cooperate for the first time will receive a 30% deposit.

 

  4. Q: How long does it take for sheet metal processing?

A: The evaluation of the delivery time will depend on the type of product you plan to produce and the completion of the graphic information. The more complete the product, the faster the production speed.

The best way is to email the drawing and production information to  and we can evaluate the delivery date based on your drawing.

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like