two heat zone 1200C Multi zone/Tube Furnace

FOB Reference Price:Get Latest Price
$1,300.00 - $3,000.00 / Piece | 1 Piece/Pieces (Min. Order)
Lead Time:
Quantity(Pieces) 1 - 1 >1
Est. Time(days) 30 Negotiable
Report Suspicious Activity
Overview
Quick Details
Classification:
Laboratory Heating Equipments
Brand Name:
CYKY
Model Number:
CY-12NT-3
Place of Origin:
Henan, China
Voltage:
AC 220V/110V 50/60 Hz Single Phase
Max. Temperature:
1200℃ (<2 hrs)
Working Temperature:
1100℃
Heating Rate:
0-30 ℃/min
Heating element:
Fe-Cr-Al Alloy doped by Mo
Heating Zone:
3
Vacuum Level:
-0.1Mpa
Controlling System:
50 Segments Programmable PID Control
Certification:
CE
Warranty:
1 Year
Supply Ability
Supply Ability:
100 Piece/Pieces per Month Brother 1200C Multi zone/Tube Furnace
Packaging & Delivery
Packaging Details
Brother 1200C Multi zone/Tube Furnace, Wooden box lined with foam
Port
Shanghai/Qingdao
Picture Example:
package-img
package-img
Lead Time :
Quantity(Pieces) 1 - 1 >1
Est. Time(days) 30 To be negotiated

two heat zone 1200C Multi zone/Tube Furnace

 

Product Description

 

Product Application:  CY-12NT-2 1200C Multi zone 

CYKY 1200C Multi zone/Tube Furnace adopt a 40,60, 70, 80 or 100mm O.D quartz tube and a pair of stainless steel vacuum sealing flanges with needle valves & gauge allow heating samples under vacuum or gas flow conditions. The temperature of this tube furnace is controlled by a high precision digital controller which provides 50 programmable segments with ± 1°C accuracy. The max. working temperature is 1200°C.

 

Main Parameters: CY-12NT-2 1200C Multi zone 

Brother 1200C Multi zone/Tube Furnace

Tube Size

Customized

Max. Temperature

1200℃ (<2 hrs)

Working Temperature

≤1100℃

Heating Rate

0~20℃/min (suggestion: ≤10℃/min)

Heating Zone

 Heating Zone

Vacuum Level

-0.1Mpa

Vacuum System

Vacuum level can reach -0.1Mpa by quality mechanical vacuum pump.

One vacuum/pressure gauge is installed on one side of flange.

One pair of SS304 vacuum flange with double high temperature silicon O-ring is included.

Heating Elements

Fe-Cr-Al alloy doped by Mo

Thermocouple

"K" type

Temperature Controller

50 segements programmable PID auto control (can be replaced by touch screen with addtional order)

Temperature Accuracy

±1℃

Cooling system

Double shell with cooling fan

Working Voltage

AC 220V/110V, Single Phase, 60/50Hz (or according to your requirement)

 

 

Company Introduction

Founded in 2005, Zhengzhou CY Scientific Instrument Co., Ltd. is a company specializing in the development and production of laboratory technology research equipment. The products are mixed, pressed, burned, cut, ground, polished, coated, analytical equipment and related consumables. Products include laboratory sintering equipment, coating equipment and so on. At present, it has been exported to 25 countries and regions such as the United States, Europe, and Southeast Asia, and has been well received by various scientific research units.

 

We have a mature technology research and development team, the number of technicians is 33, the company has 150 people, more than 500 square meters of office space, the factory covers an area of about 1,500 square meters located in Zhengzhou High-tech Zone Electronic Industrial Park. The products are mainly located in the research market, serving scientific research in the labs of universities and colleges, and can also customize products according to your needs.

Package

FAQ

 

Q. Are you a manufacturer or a trading company?

A. We are professional laboratory instrument manufacturers, have their own design team and factory, have mature technical experience, and can guarantee the quality of products and the optimal price.

 

Q. How is your company's product after-sales service system?

A. The product warranty period is 12 months, we can provide lifetime maintenance. We have professional pre-sales and after-sales departments that can respond to you within 24 hours to resolve any technical issues.

 

Q. How long is your delivery time? If I want to customize the instrument, how long does it take?

A.1. If the goods are in stock, it is 5-10 days. 2. We can provide customized services for our customers. It usually takes 30-60 days depending on the specifications of the custom instrument.

 

Q. Our country's power supply and plug are different. How do you solve it?

A. We can supply a transformer and plug according to your local requirements according to the power plug of different countries.

 

Q. How to pay?

A.T / T, L / C, D / P, etc., it is recommended to use Alibaba Trade Guarantee.

 

Q. How is the package of goods? Delivery methods?

A.1. Standard export fumigation sign wooden box packaging 2. Express, air, sea shipping according to customer requirements, find the most suitable way.

 

More questions, please contact customer service