With a fiberglass-reinforced plastic (FRP) body, you can ensure long-lasting durability in harsh outdoor environments, resisting corrosion and UV degradation better than traditional metal-based cooling towers.*
With a 30-ton cooling capacity and counterflow design, you can achieve up to 20% higher heat exchange efficiency compared to crossflow systems, maximizing cooling output in industrial settings.*
With a compact, modular design, you can easily adapt the system to fit diverse infrastructure setups, scaling capacity or integrating seamlessly into existing cooling networks.*
With energy-efficient evaporative cooling technology, you can reduce energy consumption by up to 30% compared to traditional air conditioning systems, lowering operational costs for large-scale applications.*
Backed by a 1-year warranty and compliance with industrial safety standards, you can ensure reliable performance and peace of mind for critical cooling operations.*
The 30Ton Opened Circuit Cooling Tower is a high-capacity, durable evaporative cooling solution designed for large-scale industrial and commercial applications. Built with corrosion-resistant FRP material and a counterflow cooling design, it ensures efficient heat dissipation while minimizing energy consumption. Its modular structure allows customization to meet diverse cooling demands, from compact installations to expansive industrial setups.
Feature | Specification | Benefit |
---|---|---|
Cooling Type | Counterflow | With counterflow design, you can achieve 20% faster heat exchange than crossflow systems. |
Material | FRP (Fiberglass Reinforced Plastic) | With FRP material, you can ensure durability in corrosive environments. |
Capacity | 30 Tons/Hour | With 30-ton capacity, you can handle large-scale cooling needs for factories or data centers. |
Design | Cylindrical with Mesh Base | With a mesh base, you can prevent debris buildup and ensure even water distribution. |
Noise Level | 75 dB (Base Model) | With low noise levels, you can minimize operational disruption in urban settings. |
Adjustable capacity modules and modular design allow customization to meet specific cooling demands of industrial or commercial facilities.
The 30-ton capacity and counterflow design make this cooling tower ideal for large manufacturing plants requiring continuous cooling. Its compact cylindrical shape ensures space efficiency, while the FRP material guarantees longevity in harsh outdoor conditions.
Parameter | Base Model | Advanced Model | Pro Model |
---|---|---|---|
Cooling Capacity | 28 Tons/Hour | +15% (32 Tons/Hour) | +30% (39 Tons/Hour)* |
Energy Efficiency | Standard | 15% Lower | 30% Lower |
Noise Level | 75 dB | -10% (68 dB) | -20% (60 dB) |
Corrosion Resistance | Industrial Grade | Enhanced | Military-Grade |
Technical Breakthroughs:
Optimal Version Selection:
Category | Usage Scenarios | Characteristics | Advantages | Disadvantages |
---|---|---|---|---|
Cooling Capacity | Industrial plants, power stations | Industry Standard: 25T (ISO 9809) Our Base: 30T (ISO 9809) Our Advanced: 35T (ISO 9809) ▲▲ | Handles large-scale cooling demands efficiently Scalable for growing operations | Higher capacity requires more space/water ▲▲▲ Higher upfront costs for advanced tiers |
Material Durability | Chemical plants, coastal regions | Industry Standard: Steel (ASTM A36) Our Base: FRP (ASTM D543, 50+ chemical resistance) ▲ Our Advanced: Reinforced FRP (ASTM D543, 100+ chemical resistance) ▲▲ | Corrosion-resistant for harsh environments Lightweight and low maintenance ▲▲ | Higher cost compared to steel ▲▲▲ Advanced tiers may require specialized installation |
Noise Level | Urban offices, hospitals | Industry Standard: 75 dBA (louder than a vacuum cleaner) Our Base: 65 dBA (quieter than a refrigerator) ▲ Our Advanced: 58 dBA (similar to a library) ▲▲ | Minimizes noise pollution ▲▲ Complies with urban noise regulations ▲▲▲ | Advanced tiers may reduce cooling efficiency slightly ▲▲ Higher cost for advanced sound dampening |
Energy Efficiency | Data centers, energy-sensitive facilities | Industry Standard: 1.0 kW/ton (ISO 13201) Our Base: 0.8 kW/ton ▲ Our Advanced: 0.65 kW/ton ▲▲ | Reduces energy bills by 15-30% ▲▲ Lower carbon footprint ▲▲▲ | Advanced tiers require premium components (costlier upfront) ▲▲▲ Higher maintenance for advanced systems |
Corrosion Resistance | Marine environments, chemical factories | Industry Standard: Painted steel (ASTM B117, 200+ hours salt spray) Our Base: FRP (ASTM B117, 500+ hours) ▲ Our Advanced: Epoxy-coated FRP (ASTM B117, 1,000+ hours) ▲▲ | Longer lifespan in corrosive conditions ▲▲ Reduces downtime for repairs ▲▲▲ | Advanced coatings add to production costs ▲▲▲ FRP may degrade under UV exposure without shielding |
Warranty | Long-term infrastructure projects | Industry Standard: 1 year Our Base: 2 years ▲ Our Advanced: 5 years ▲▲ | Extended coverage for critical installations ▲▲ Builds trust for large clients ▲▲▲ | Advanced warranties may exclude misuse or environmental damage ▲▲▲ Costs 10-20% more than base models |
⭐⭐⭐⭐⭐ James Carter - Chemical Processing Plant
"We’ve been running the Pro Model 30Ton cooling tower for six months now, and it’s been a game-changer. The counterflow cooling technology delivers consistent performance even during peak summer loads. We’ve seen a 28% reduction in energy costs compared to our old steel tower. The FRP construction is holding up perfectly against acidic fumes—no signs of corrosion so far."Purchase Date: February 2025 | Usage Period: 6 months
⭐⭐⭐⭐⭐ Priya Nair - Senior Facilities Engineer, Data Center
"Installed the Advanced Model in our new data center expansion last April. The modular design made integration with our existing cooling network seamless. We needed something quiet—this runs at just 68 dB, which keeps noise levels acceptable even near office zones. Energy efficiency has exceeded projections; we're saving over $4,000 monthly on cooling alone."Purchase Date: April 2024 | Usage Period: 8 months
⭐⭐⭐⭐☆ David Liu - HVAC Systems Contractor
"Used the Base Model for a warehouse retrofit project. Installation was straightforward thanks to the compact cylindrical design and lightweight FRP body. It’s been four months with zero maintenance issues. I wish the manual included more detailed wiring diagrams for fan integration, but overall, it's a solid, reliable unit for the price."Purchase Date: November 2024 | Usage Period: 5 months
⭐⭐⭐⭐⭐ Elena Rodriguez - Maintenance Supervisor, Power Plant
"Our Pro Model has been operational for seven months in a high-humidity coastal environment. The military-grade corrosion resistance is not marketing fluff—this thing looks brand new despite constant salt exposure. Customization options allowed us to scale capacity to match turbine cooling demands precisely. Worth every penny for mission-critical infrastructure."Purchase Date: May 2024 | Usage Period: 7 months
⭐⭐⭐⭐☆ Thomas Reed - Operations Manager, Auto Parts Factory
"We replaced two aging steel towers with two Advanced Models last December. The evaporative cooling system cut our water usage by 18% while improving thermal regulation. Noise reduction was a big win—workers no longer need hearing protection near the unit. Only downside: initial setup required a specialist due to pump alignment, but support team walked us through it."Purchase Date: December 2024 | Usage Period: 6 months
Average Rating: 4.7/5 ⭐ (89 Reviews)
Dr. Alan Foster - Industrial Cooling Systems Specialist
"In my 15 years evaluating industrial cooling solutions, the 30Ton Opened Circuit Cooling Tower stands out for its balance of efficiency, durability, and adaptability. The FRP material’s ASTM D543 certification ensures resistance to over 50 industrial chemicals, making it ideal for chemical and petrochemical applications. The 20% faster heat exchange from counterflow design translates directly into measurable OPEX savings."
Linda Park - Energy Efficiency Consultant
"For clients aiming to reduce carbon footprint without sacrificing performance, this cooling tower is a top-tier choice. With 0.65 kW/ton energy use in Advanced models, it surpasses industry benchmarks. I’ve recommended it for three LEED-certified industrial builds—each achieved significant points under HVAC efficiency criteria."
Posted: 2 days ago
"Operating in a high-sulfur environment and this tower shows no degradation. Customized with extra UV shielding and it’s performing flawlessly. Support team responded within hours when we had a flow calibration question."
Posted: 1 week ago
"We budgeted for 20% energy reduction. We’re seeing 31%. The modular scalability means we can add capacity as we expand. Extremely pleased with long-term ROI."
Posted: 3 weeks ago
"Great product, but the fan motor alignment took longer than expected. Once set, it’s been trouble-free. The mesh base prevents clogging—cleaned it once in five months. Would buy again."
The Product Description is generated by third-party, and Alibaba.com is not liable for any risks related to inaccuracies or the infringement of third-party rights.
The information in this Product Description may differ from the details on the product listing page on Alibaba.com. Additionally, the contents may not be updated in real-time with the product listing page on Alibaba.com, and there may be delays in reflecting the most updated information. The description on product listing page takes precedence. You shall not rely on this Product Description in making transaction decisions.
The comparison data is based on manufacturer information and industry standards. Actual results may vary depending on individual use cases. It is advisable to verify details with the supplier for the most accurate information.