Material Composition | Outdoor events, commercial installations | - Industry Standard: Basic PVC (ASTM D3784) - Our Base: Soft PVC (ASTM D3784 compliant) ▲ - Our Advanced: Treated PVC with UV resistance (ISO 105-B02) ▲▲ | Base: Lightweight and flexible; Advanced: UV protection for prolonged outdoor use | Base: Less durable in harsh UV; Advanced: Heavier and costlier |
Portability & Foldability | Portable presentations, outdoor screenings | - Industry Standard: Non-foldable (ISO 9001) - Our Base: Foldable (ANSI Z80.20) ▲ - Our Advanced: Fast-fold mechanism (reduces setup by 40%) ▲▲ | Base: Easy storage; Advanced: Rapid deployment for time-sensitive events | Base: Potential image distortion at seams; Advanced: Higher price |
Screen Size | Large gatherings, cinema setups | - Industry Standard: 200" (ANSI) - Our Base: 250" (ANSI/INFOCOMM) ▲ - Our Advanced: 300" (ANSI/INFOCOMM) ▲▲ | Base: Balances portability and visibility; Advanced: Immersive experience for 3D/IMAX content | Base: Limited for large crowds; Advanced: Bulky and requires more space |
Brightness & Clarity | Bright environments, outdoor use | - Industry Standard: 2000 ANSI lumens (ISO 21118) - Our Base: 2500 ANSI lumens ▲ - Our Advanced: 3000 ANSI lumens ▲▲ | Base: Clear in moderate daylight; Advanced: Sharp visuals even in direct sunlight | Base: Moderate power draw; Advanced: Higher energy consumption |
Durability & Longevity | Frequent use, rugged environments | - Industry Standard: Standard PVC (5000 fold lifespan) - Our Base: Reinforced layers (10,000 folds) ▲ - Our Advanced: Double-reinforced (20,000 folds) ▲▲ | Base: 2x longer lifespan; Advanced: Industrial-grade reliability | Base: Slightly bulkier; Advanced: Adds weight and cost |
Warranty & Support | High-risk events needing reliability | - Industry Standard: 6-month warranty - Our Base: 1-year warranty ▲ - Our Advanced: 2-year warranty (includes accidental damage) ▲▲ | Base: Standard coverage; Advanced: Comprehensive protection for critical use | Base: Limited accidental damage coverage; Advanced: Higher upfront cost |