Material & Construction | Industrial/Commercial Power Systems | Industry Standard: Basic metal alloy (ASTM A36) Our Base: Reinforced steel (ASTM A533) Our Advanced: Aluminum + corrosion-resistant coating (ASTM B209) | ▲ Base: 20% lighter than Industry Standard (e.g., 15kg vs 18kg) ▲▲ Advanced: 50% longer lifespan in corrosive environments | Advanced: Higher upfront cost (+20%) due to premium materials |
Switching Speed | Data Centers, Hospitals (Critical Loads) | Industry Standard: 20ms switching time Our Base: 10ms (IEC 60850) Our Advanced: 5ms (IEC 61850) | ▲ Base: 50% faster than Industry Standard (minimizes downtime) ▲▲ Advanced: Ensures seamless power transfer for sensitive equipment | Advanced: Requires higher maintenance frequency (+10%) |
Load Capacity | Industrial Plants, High-Power Facilities | Industry Standard: 80A frame current Our Base: 100A (IEC 60947) Our Advanced: 120A (UL 1008) | ▲ Base: Supports 25% higher loads than Industry Standard ▲▲ Advanced: Handles peak surges in heavy machinery | Advanced: Larger footprint (+25%) compared to Base |
Control Options | Remote Monitoring Systems | Industry Standard: Manual override only Our Base: Digital display + manual override Our Advanced: Remote monitoring (Modbus RTU) | ▲ Base: Real-time status visibility via LCD (e.g., voltage/current readings) ▲▲ Advanced: Remote diagnostics and firmware updates | Advanced: Requires additional IoT infrastructure setup |
Certifications | Global Compliance Markets | Industry Standard: Basic CE certification Our Base: CE + IEC 61439 Our Advanced: CE + UL + ISO 9001 | ▲ Base: Meets EU and Asia-Pacific standards ▲▲ Advanced: Access to North American and global markets | Advanced: Longer certification process (+3 months) |
Customization | Tailored Industrial Solutions | Industry Standard: Fixed 3-pole configuration Our Base: 4-pole (IEC 60947-6) Our Advanced: Configurable poles (up to 6-pole) | ▲ Base: Supports 4-wire systems for balanced loads ▲▲ Advanced: Adapts to hybrid power setups (e.g., solar + grid) | Advanced: Customization delays delivery by 1–2 weeks |