Material Composition | Outdoor events, temporary structures | Industry Standard: Steel (yield strength 250 MPa) ▼ Our Base: Aluminum (300 MPa ▲) Our Advanced: 6061-T6 Aluminum Alloy (350 MPa ▲▲) | Lighter weight (Our Base: 30% lighter than steel) Corrosion resistance (ASTM B117 salt spray test, 500+ hours) | Higher cost for advanced alloys (▲▲ tier) |
Mobility | Rapid setup/disassembly (e.g., festivals) | Industry Standard: Fixed-base designs ▼ Our Base: Wheeled caster mounts ▲ Our Advanced: Foldable modular joints ▲▲ | Easy relocation (Our Base: 2x faster assembly than industry) Space-saving storage (Advanced: 40% smaller footprint) | Advanced joints require training for assembly |
Shape Customization | Brand activations, trade shows | Industry Standard: Limited to rectangular/square ▼ Our Base: 4 shapes (arch, circle, triangle, square) ▲ Our Advanced: Custom CAD-designed curves ▲▲ | Versatile branding (e.g., circular domes for immersive experiences) Patented shape adapters (ISO 14001 compliance) | Custom shapes incur 20% longer lead times |
Load Capacity | Heavy-duty events (e.g., concerts) | Industry Standard: 100 kg/m² ▼ Our Base: 150 kg/m² ▲ Our Advanced: 200 kg/m² ▲▲ (EN 1993-1-1 certified) | Supports heavy equipment (e.g., LED screens, AV gear) Wind resistance up to 60 km/h (Advanced ▲▲) | Base tier may require additional bracing in high winds |
Surface Finish | Corporate events, weddings | Industry Standard: Matte paint ▼ Our Base: UV-resistant vinyl wrap ▲ Our Advanced: Glow-in-the-dark coating ▲▲ | Durability (vinyl: 5-year outdoor lifespan) Lightweight (Advanced coating: 0.5 kg/m²) | Advanced coatings add 15% to cost |
Assembly Time | Time-sensitive deployments (e.g., pop-ups) | Industry Standard: 8+ hours ▼ Our Base: 4 hours ▲ Our Advanced: 1.5 hours ▲▲ (tool-free connectors) | Reduces labor costs (Base: 50% fewer workers) Quick deployment for emergency shelters | Advanced systems require specialized training |