Flush Type | High-traffic restrooms, eco-conscious households | Industry Standard: Single flush (10L/flush) Our Base: Dual flush (6/3L, ISO 9000 compliant) ▲ Our Advanced: Eco dual (4.5/1.5L, WaterSense certified) ▲▲ | Reduced water usage (Our Base: 50% savings vs Standard; Advanced: 85% savings) | Higher upfront cost for Advanced versions; requires user education for dual flush |
Material | Commercial bathrooms, humid environments | Industry Standard: PVC (ASTM D1784) Our Base: ABS plastic (ASTM D4329) ▲ Our Advanced: Stainless Steel (ASTM A240) ▲▲ | Enhanced corrosion resistance (Advanced: 10x longer lifespan in saltwater tests) | Advanced versions heavier; Base may degrade in extreme heat (▲ icon shows improvement over PVC) |
Noise Level | Hospitals, hotels, residential bathrooms | Industry Standard: 50 dB (loud flush) Our Base: 45 dB (▲ 50% quieter) Our Advanced: 40 dB (▲▲ whisper-quiet, quieter than a refrigerator) | Ideal for noise-sensitive spaces (e.g., libraries, offices) | Advanced designs may require custom installation for optimal sound dampening |
Water Efficiency | Water-restricted regions, smart homes | Industry Standard: 12L/flush Our Base: 6L (▲ 50% savings) Our Advanced: 4.5L (▲▲ 62.5% savings) | Meets WaterSense standards (Advanced); slashes utility bills by ~30% annually | May demand higher water pressure (Advanced requires 25 PSI+ for optimal function) |
Control Type | Public restrooms, healthcare facilities | Industry Standard: Manual lever Our Base: Hand control (ergonomic grip, ASTM F791 compliance) ▲ Our Advanced: Sensor-activated (IR tech, IP67 rated) ▲▲ | Hygiene-focused (Advanced reduces touchpoints by 90%) | Advanced versions need battery/power supply; Base may require frequent cleaning |
Durability | Commercial buildings, heavy-use settings | Industry Standard: 5-year lifespan (ASTM B117 salt spray test) Our Base: 8 years (▲ 60% longer) Our Advanced: 12 years (▲▲ 140% longer) | Low replacement costs over time (Advanced saves $200+/unit over 10 years) | Advanced materials may increase procurement lead times by 2-3 weeks |