Wood Formwork | Small-scale projects, temporary structures | Made of treated wood (ASTM D1990), Reusable up to 10 cycles (ASTM C39), 2000 psi load capacity (ASTM C39) | Low initial cost, lightweight (800 kg/m³) | Limited reusability, requires frequent maintenance (▲0 cycles/year) |
Steel Formwork | High-rise buildings, heavy load projects | Carbon steel (ASTM A36), Reusable up to 100 cycles, 8000 psi load capacity (ASTM C39) | High durability, high load capacity (▲6000 psi over Wood) | High cost (▲50% vs. Plastic), heavy weight (2500 kg/m³) |
Aluminum Formwork | Mid-rise buildings, moderate loads | Aluminum alloy (ASTM B211), Reusable up to 50 cycles, 4000 psi load capacity (ASTM C39) | Moderate weight (1900 kg/m³), corrosion-resistant | Lower load capacity (▲-1000 psi vs. Steel), moderate cost |
Our Base Plastic Formwork | Column formwork for hotels, building projects | HDPE (ISO 2230), Reusable 30 cycles (ASTM C39), 5000 psi load capacity (ASTM C39), 2h assembly (ISO 12192) | Lightweight (950 kg/m³), cost-effective (▲-30% vs. Steel), easy assembly | Limited to column applications, lower load capacity (▲-1000 psi vs. Advanced) |
Our Advanced Plastic Formwork | Large-scale column projects, high-strength needs | Reinforced HDPE (ISO 12236), Reusable 50 cycles (▲20 cycles), 6000 psi load capacity (▲1000 psi), 1.5h assembly (▲0.5h faster) | Enhanced durability (▲66% reuse cycles), higher load capacity (▲20% over Base) | Slightly higher cost (▲15% vs. Base), requires training for advanced features |
Prefabricated Formwork Systems | Standardized structures (e.g., bridges) | Pre-assembled units (ISO 12192), Load capacity varies (ASTM C39) | Fast installation (reduces labor by 30%), consistent quality | Limited customization (▲0% adjustability), higher upfront cost (▲20-30%) |