Material Composition | Hotels, Resorts, Luxury Housing | Industry Standard: Basic steel (ASTM A36) Our Base: High-grade steel (ASTM A572) Our Advanced: Steel + Sandwich panels (ISO 10456) | ▲ Base: 20% stronger than industry standard (ASTM A572 Grade 50) ▲ Advanced: 30% better thermal insulation (R-15 rating) | Advanced version adds 15% to cost due to premium materials |
Noise Level | Office Spaces, Residential Areas | Industry Standard: 50 dBA (equivalent to traffic noise) Our Base: 45 dBA (quieter than a refrigerator) Our Advanced: 40 dBA (library-level quiet) | ▲ Base: Reduces noise by 10% via double-glazed windows ▲ Advanced: 20% quieter with soundproofing foam (ISO 140-9) | Advanced version requires thicker walls, reducing interior space by 5% |
Weight Efficiency | Temporary Installations, Frequent Relocation | Industry Standard: 2000 kg/m² Our Base: 1800 kg/m² (lightweight steel frame) Our Advanced: 1600 kg/m² (aluminum composite panels) | ▲ Base: 10% lighter, reduces crane load requirements ▲ Advanced: 20% lighter, lowers transportation costs by 15% | Advanced material may require specialized assembly tools |
Chemical Resistance | Industrial Zones, Chemical Labs | Industry Standard: ASTM D543 (30 chemical exposures) Our Base: 50+ exposures (ASTM F739) Our Advanced: 70+ exposures (ISO 2812-2) | ▲ Base: Withstands corrosive environments (e.g., coastal resorts) ▲ Advanced: Resistant to 95% of common industrial chemicals | Requires periodic surface coating for maximum durability |
Thermal Insulation | Extreme Climates, Energy-Efficient Buildings | Industry Standard: R-10 (ISO 10456) Our Base: R-12 (double-layer panels) Our Advanced: R-15 (vacuum-insulated panels) | ▲ Base: Reduces HVAC energy use by 15% ▲ Advanced: 30% lower energy costs (meets LEED Gold standards) | Advanced panels add 25% to material thickness |
Customization Flexibility | Mixed-Use Developments, Modular Expansions | Industry Standard: Limited (pre-designed modules) Our Base: Adjustable layouts (ISO 21434-compliant) Our Advanced: Full 3D customization (BIM integration) | ▲ Base: 20% faster assembly with modular components ▲ Advanced: 50% faster design-to-deployment via AI modeling | Advanced customization may delay delivery by 2–3 weeks |