Material & Durability | Outdoor structures (farms, factories) | Industry Standard: Regular iron (20yr lifespan) Our Base: Wrought iron (30yr▲) Our Advanced: Heat-treated wrought iron (50yr▲▲) (ASTM A153 compliant) | ▲ Base: 50% longer lifespan than industry. ▲▲ Advanced: Doubles industry durability. | Advanced version costs 30% more due to heat treatment. |
Assembly Ease | DIY installations, quick setups | Industry Standard: Requires professional assembly Our Base: Modular design (40% faster DIY) Our Advanced: Pre-assembled panels (fully plug-and-play) | ▲ Base: Reduces labor costs by $200+. ▲▲ Advanced: No expertise required. | Base lacks customization options for unique designs. |
Surface Treatment | Coastal areas, high humidity environments | Industry Standard: Paint coating (rusts in 5yrs) Our Base: Powder coating (10yr▲) Our Advanced: Corrosion-resistant powder coat (15yr▲▲) (ASTM B117 salt spray test) | ▲ Base: 50% longer rust-free life. ▲▲ Advanced: Withstands 1,000+ hours of salt exposure. | Advanced coating adds $50–$70 per sqm. |
Application Versatility | Residential/commercial properties | Industry Standard: Single-use (e.g., farm fencing) Our Base: 4 applications (garden, factory, highway) Our Advanced: 6+ uses (includes decoration, sport fencing) | ▲ Base: Reduces need for multiple products. ▲▲ Advanced: Fits 60% more use cases. | Bulkier storage required for multi-use designs. |
Eco-Friendly Features | Green-certified projects | Industry Standard: Non-recycled materials Our Base: 50% recycled content▲ Our Advanced: 70% recycled + carbon-neutral production▲▲ (LEED v4.1 compliant) | ▲ Base: Meets basic sustainability standards. ▲▲ Advanced: Qualifies for LEED credits. | Advanced version has a 15% higher material cost. |
Aesthetic Design | Architectural landmarks, luxury homes | Industry Standard: Plain grid patterns Our Base: Basic ornate designs▲ Our Advanced: Customizable intricate patterns (ISO 9001 certified)▲▲ | ▲ Base: Enhances curb appeal by 30%. ▲▲ Advanced: Tailored to match any architectural style. | Custom designs add 2–3 weeks to production time. |