Material Composition | Industrial Packaging, Apparel Lining | - Industry: 100% polyester (ASTM D1234 tested)
- Our Base: 60/40 polyester/cotton blend (▲ breathability)
- Our Advanced: 50/50 blend + 30% recycled polyester (▲▲ sustainability, GRS certified)
| Base: Reduced static, better breathability Advanced: Enhanced sustainability and premium feel | Base: 15% cost increase vs Industry Advanced: Requires specialized sourcing |
Eco-Friendly | Children's Apparel, Medical Supplies | - Industry: No certification
- Our Base: OEKO-TEX Standard 100 (▲ free of harmful substances)
- Our Advanced: OEKO-TEX + GOTS (▲▲ organic cotton, 90%+ organic content)
| Base: Safe for sensitive uses Advanced: Meets organic standards for premium markets | Certifications add 20-30% to production costs |
Thickness (GSM) | Heavy-Duty Packaging, Industrial Use | - Industry: 250 GSM (ISO 3801)
- Our Base: 285 GSM (▲ 14% thicker for durability)
- Our Advanced: 300 GSM (▲▲ 20% thicker for extreme wear)
| Base: Outperforms Industry in tear resistance Advanced: Ideal for harsh environments | Heavier than lighter alternatives (e.g., 20% denser than 200 GSM) |
Pattern Type | Luxury Accessories, Premium Goods | - Industry: Plain finish
- Our Base: Flocked finish (ASTM D4800 adherence ▲ velvet-like texture)
- Our Advanced: Flocked + embossed patterns (▲▲ customizable designs)
| Base: Adds aesthetic appeal for premium branding Advanced: Enables unique logos/textures | Base: 25% higher production cost vs plain Advanced: Requires specialized tooling |
Production Technique | Mass Production, Quick Turnaround | - Industry: Woven (EN ISO 9001)
Our Base: Nonwoven (▲ 30% faster production) - Our Advanced: Nonwoven + thermal bonding (▲▲ 2x stronger seams)
| Base: Cost-effective for bulk orders Advanced: Withstands repeated stress in industrial use | Less flexible for complex 3D shapes vs woven |
Customization | Custom Apparel, Unique Packaging | - Industry: Limited options
- Our Base: Make-to-order (▲ tailored dimensions/patterns)
- Our Advanced: Rapid prototyping (▲▲ 50% faster prototyping)
| Base: Meets specific client specs Advanced: Reduces lead time by 40% | Base: 10-day lead time vs Industry’s 5-day Advanced: Requires CAD software investment |