Load Capacity | Small construction sites, material transport | Industry: 2.5 tons (EN 13000) Base: 3 tons (▲1, ISO 10250) Advanced: 3.5 tons (▲2) | Handles heavier materials than industry average; Advanced maximizes bulk transport efficiency | Higher capacity requires more storage space; Advanced model may incur extra costs |
Engine Power | Heavy-duty excavation, prolonged operation | Industry: 80kW (ISO 8178) Base: 90kW (▲1) Advanced: 92kW (▲2) | Base provides robust power; Advanced ensures faster task completion | Higher power increases fuel consumption; Advanced requires premium maintenance |
Maneuverability | Tight urban sites, confined spaces | Industry: 5.5m turning radius (EN 12188) Base: 5.2m (▲1) Advanced: 4.8m (▲2) | Base improves navigation in narrow areas; Advanced enhances precision | Sharper turns reduce stability at high speeds; Advanced steering systems add complexity |
Attachment Versatility | Diverse tasks (excavation, grading) | Industry: 10 attachments (ISO 12183) Base: 12 (▲1) Advanced: 15 (▲2) | Base supports multi-tasking; Advanced accommodates specialized tools | Additional attachments increase upfront costs; Requires training for optimal use |
Fuel Efficiency | Long operational hours, cost-sensitive projects | Industry: 20 L/100km (SAE J1321) Base: 18 L/100km (▲1) Advanced: 16 L/100km (▲2) | Base reduces fuel costs; Advanced lowers emissions | Efficient engines may require premium fuel; Advanced systems add to maintenance |
Warranty Coverage | High-usage industrial environments | Industry: 6 months (ASTM E2578) Base: 12 months (▲1) Advanced: 24 months (▲2) | Extended warranties reduce long-term risks; Advanced offers 2-year structural protection | Longer warranties may come with higher purchase prices; Advanced requires compliance with maintenance schedules |