Energy Efficiency | Home, Offices, Retail Spaces | Industry Standard: 50W (equivalent to 500W incandescent) Our Base: 30W (equivalent to 300W) Our Advanced: 30W (equivalent to 400W via 20% efficiency gain)▲ | Lower energy costs, eco-friendly certifications (RoHS, EPR) ▲ Advanced reduces energy use by 25% vs. competitors | Base/Advanced may underperform in very large warehouses requiring intense lighting |
Light Output | Commercial Lighting, Art Galleries | Industry Standard: 1,800 lumens (non-COB LEDs) Our Base: 2,500 lumens (COB LEDs) Our Advanced: 3,200 lumens▲ (COB + precision optics) | ▲ Advanced provides 73% more lumens than industry standard COB ensures uniform illumination | Base lacks dimming for nuanced brightness control (Advanced includes this) |
Adjustability | Retail Displays, Museum Exhibits | Industry Standard: Fixed beam angle Our Base: Manual adjustment (±45°) Our Advanced: Motorized zoom (±90° with remote control)▲ | ▲ Advanced enables remote fine-tuning for dynamic setups Base suits static installations | Advanced requires training for optimal use in complex environments |
Durability | Industrial Workshops, High-Traffic Areas | Industry Standard: Plastic housing (ASTM D638 Grade 1) Our Base: Aluminum alloy (EN AW-6063-T5) Our Advanced: Reinforced aluminum + IP65 rating▲ | ▲ Advanced resists dust/water ingress (IP65) Base withstands 10,000+ cycles of adjustment | Base/Advanced may add 15% more weight compared to plastic alternatives |
Customization | Hospitality, Event Spaces | Industry Standard: Fixed white light (4000K) Our Base: 3,000K–5,000K adjustable Our Advanced: 2,700K–6,500K + color tuning▲ | ▲ Advanced mimics natural light cycles for circadian rhythm support Base covers most common color temps | Advanced adds complexity for users unfamiliar with lighting science |
Installation Flexibility | Multi-room Homes, Office Renovations | Industry Standard: Basic track mounting (no design support) Our Base: 4-wire track + basic design tools Our Advanced: Motorized track + full project design service▲ | ▲ Advanced includes onsite metering and circuitry design (saves 30% installation time) | Base requires DIY wiring expertise; Advanced incurs higher upfront costs |