Thermal Insulation | Office buildings, commercial spaces | Industry Standard: R-value 3.2 m²·K/W (ISO 9705) Our Base: R-value 4.0 m²·K/W (▲) Our Advanced: R-value 4.5 m²·K/W (▲▲) (Exceeds ISO 9705 requirements) | Superior energy efficiency ▲▲ Reduces heating/cooling costs by 20% | Higher cost for Advanced tier ▲▲ Thicker panels may require structural adjustments |
Fire Resistance | High-rise buildings, hospitals | Industry Standard: 30-min fire endurance (ASTM E119) Our Base: 60-min fire endurance (▲) Our Advanced: 120-min fire endurance (▲▲) (Class A per ASTM E84) | Meets UL 1971 safety standards ▲▲ Protects structural integrity longer | Advanced version adds 10% weight ▲▲ Installation requires专业 fire barriers |
Acoustic Performance | Schools, hospitals, open-plan offices | Industry Standard: 35 dBA noise reduction Our Base: 40 dBA (▲) Our Advanced: 43 dBA (▲▲) (Quieter than a refrigerator hum) | Reduces external noise by 30% ▲▲ Meets OSHA workplace noise regulations | Limited effectiveness in high-frequency environments ▲▲ Thickness impacts aesthetics |
Chemical Resistance | Industrial facilities, chemical plants | Industry Standard: Withstands 20 chemical exposures (ASTM D543) Our Base: 30 exposures (▲) Our Advanced: 50+ exposures (▲▲) (Passes ASTM F739 permeation tests) | Resists corrosive agents like acids/bases ▲▲ Protects against mold growth | Base version may degrade in extreme pH environments ▲ Advanced requires专业 cleaning |
Density & Weight | Lightweight construction projects | Industry Standard: 120 kg/m³ density Our Base: 80 kg/m³ (▲) Our Advanced: 75 kg/m³ (▲▲) (Lighter than fiberglass insulation) | Easier handling ▲▲ Reduces structural load demands | Lower density may compromise fire resistance in Base tier ▲ Advanced needs加固 for heavy loads |
Customization | Custom architectural designs | Industry Standard: Limited to standard sizes Our Base: Custom length (▲) Our Advanced: Custom length + shape (▲▲) (ISO 3801-compliant cutting) | Fits irregular spaces ▲▲ Reduces waste by 15% | Advanced customization adds 20% lead time ▲▲ Requires专业 tools for installation |