Material & Finish | Residential/Commercial Buildings | Industry Standard: Mild Steel (ASTM A36) Our Base: Aluminum Profile (EN AW-6063) Our Advanced: Stainless Steel (ASTM A314) | ▲ Base: Lightweight, corrosion-resistant ▲▲ Advanced: 10x longer lifespan, hygienic | Advanced: 20% higher cost due to premium material |
Noise Level | Hospitals, Office Buildings | Industry Standard: 50 dBA (ISO 140-41) Our Base: 45 dBA Our Advanced: 40 dBA (quieter than a whisper) | ▲▲ Advanced: Reduces stress in healthcare settings Meets OSHA noise regulations | Base: Moderate cost premium vs. basic models |
Control System | High-Traffic Environments | Industry Standard: Basic VVVF Our Base/Advanced: Monarch VVVF Controller (IEC 60204) with predictive maintenance alerts | ▲▲ Both tiers: 30% faster response time Energy-efficient operation | No significant disadvantage |
Speed | Residential (Low Rise) vs. Commercial | Industry Standard: 1.5 m/s Our Base: 1.0 m/s Our Advanced: 2.5 m/s (ISO 4190) | ▲ Base: Cost-effective for 4–6 story buildings ▲▲ Advanced: 2x faster for high-rise efficiency | Advanced: 40% higher upfront cost |
Traction Mechanism | Heavy-Duty Applications | Industry Standard: Geared Traction Our Base: Geared (ISO 4190) Our Advanced: Gearless Traction (IEC 61685) | ▲▲ Advanced: 50% smoother ride, zero gear wear Lower maintenance | Advanced: Requires specialized installation expertise |
Safety & Certifications | Global Markets | Industry Standard: Basic CE Our Base/Advanced: CE, Reach, SGS, TÜV (EN 81-20) | ▲▲ Both tiers: Compliance with 5+ international standards Emergency stop + backup power (IEC 60204) | No disadvantage |
Installation Complexity | Retrofit Projects | Industry Standard: 7–10 days Our Base: 5 days (modular design, IEC 61400-25) Our Advanced: 3 days (pre-assembled components) | ▲▲ Advanced: Reduces downtime by 70% Easy integration with existing structures | Advanced: Requires certified technicians |