All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier
  • Light Weight Aluminum Catwalk Linked with Scaffolding Tower
  • Light Weight Aluminum Catwalk Linked with Scaffolding Tower
  • Light Weight Aluminum Catwalk Linked with Scaffolding Tower
  • Light Weight Aluminum Catwalk Linked with Scaffolding Tower
  • Light Weight Aluminum Catwalk Linked with Scaffolding Tower
  • Light Weight Aluminum Catwalk Linked with Scaffolding Tower
Light Weight Aluminum Catwalk Linked with Scaffolding Tower

Light Weight Aluminum Catwalk Linked with Scaffolding Tower

  • 100 - 499 Pieces
    $70
  • >= 500 Pieces
    $66

Customization:

Customized logo(Min.Order: 500 pieces)
Customized packaging(Min.Order: 500 pieces)
Graphic customization(Min.Order: 500 pieces)

Light Weight Aluminum Catwalk Linked with Scaffolding Tower

Product overview

Core functionalities

Applicable scenarios

Unique advantages

  • Stable Elevated Work Platform: Designed as lightweight aluminum alloy scaffolding planks, providing a durable and slip-resistant surface for workers during construction, maintenance, or renovation.
  • Structural Integration: Ribbed aluminum design enhances rigidity and load-bearing capacity, enabling seamless linking with scaffolding towers to create secure catwalk systems.

Key features

  • 1. Corrosion-Resistant Aluminum Alloy Construction

  • With corrosion-resistant aluminum alloy, ensure long-term durability in harsh construction environments compared to traditional steel models*.

  • 2. Integrated Linking System for Modular Assembly

  • With an integrated linking system, easily connect to scaffolding towers for modular assembly and quick setup on-site*.

  • 3. Lightweight yet High-Load Capacity Design

  • With a lightweight yet robust design, reduce physical strain during installation while maintaining a load capacity exceeding industry standards*.

  • 4. Versatile Scenario Adaptability

  • Designed for commercial and construction scenarios, provide reliable support for both temporary scaffolding setups and permanent elevated work platforms*.

  • 5. 2-Year Manufacturer Warranty for Reliability

  • With a 2-year warranty, ensure peace of mind and reliability backed by the manufacturer’s commitment to product quality*.

  • Notes:

    • The product’s aluminum alloy material ensures corrosion resistance and weight savings compared to steel alternatives.

Product details

Light Weight Aluminum Catwalk Linked with Scaffolding Tower

The Light Weight Aluminum Catwalk Linked with Scaffolding Tower is a durable, versatile solution for construction and office building applications. Crafted from high-quality aluminum alloy, it combines lightweight design with robust structural integrity. The traditional-style scaffolding planks ensure compatibility with standard scaffolding systems, while the ribbed surface enhances grip and load distribution.

Technical specifications

FeatureSpecificationBenefit
MaterialAluminum AlloyLightweight, corrosion-resistant, and durable
ApplicationOffice Building, ConstructionMeets safety standards for diverse work sites
StyleTraditionalEnsures seamless integration with scaffolding systems
Ribbed DesignReinforced grooves along the surfaceImproves grip and distributes weight evenly
Warranty2 yearsComprehensive coverage for structural issues

Customization guide

Adjustable parameters include length and width to fit specific project dimensions, surface finish (e.g., anodized or powder-coated) for aesthetic or environmental needs, and attachment points (e.g., pre-drilled holes) for customized mounting.

Get inspired

Ideal for temporary walkways, elevated work platforms, or rooftop installations, this catwalk system ensures safety and efficiency. Its lightweight design reduces installation effort, while the ribbed surface prevents slips in wet or dusty conditions.

Choose your model

ParameterBase ModelAdvanced ModelPro Model
Load Capacity300 kg/m²+15% (345 kg/m²)+30% (390 kg/m²)*
Corrosion ResistanceStandard (SS225)Enhanced (SS400)Premium (SS600)
CompatibilityBasic scaffoldingModular systemsUniversal systems

Supplier's note

  1. Technical Breakthroughs:

    • The Pro Model’s SS600 corrosion resistance triples industry standards, enabling safe use in marine or industrial environments.
    • The ribbed design improves load distribution by 25%, reducing bending stress under heavy use.
    • Aluminum alloy reduces weight by 40% compared to steel, simplifying transport and installation.
  2. Version Selection Guide:

    • Base Model: Suitable for light-duty office renovations or temporary setups where standard load requirements apply.
    • Advanced Model: Ideal for mid-scale construction projects needing enhanced durability and modular compatibility.
    • Pro Model: Recommended for heavy industrial use, such as bridge construction or offshore platforms. With its tripled corrosion resistance, you can ensure longevity in harsh environments. Pair it with the ribbed surface to achieve zero-slip safety for workers.

*Note: SS refers to corrosion resistance ratings per ASTM A153 standards.

Frequently asked questions

  • Which aluminum scaffolding planks are best suited for office building construction projects?

  • How do I clean and maintain aluminum catwalk planks linked to scaffolding towers?

  • Why choose aluminum scaffolding planks over steel for construction sites?

  • Can these aluminum catwalk planks be customized for specific project dimensions?

  • Are these scaffolding planks compliant with safety standards for construction use?

  • Are lightweight aluminum catwalk planks suitable for heavy-duty construction projects?

  • How does the linked design of the aluminum catwalk enhance safety on scaffolding towers?

  • What’s the expected lifespan of aluminum scaffolding planks with a 2-year warranty?

Product comparison

CategoryUsage ScenariosCharacteristicsAdvantagesDisadvantages
Material CompositionCorrosive environments (e.g., coastal construction)Industry Standard: Carbon Steel
Our Base: Aluminum Alloy 6061 (ASTM B221)
Our Advanced: Aluminum 6061 + Zinc Coating (ASTM A153)
▲ Base: 50% lighter than steel; resists rust.
▲▲ Advanced: Double corrosion protection (1,000+ hours salt spray test).
Industry Standard: Requires frequent anti-corrosion maintenance.
WeightFrequent relocation of scaffoldingIndustry Standard: 10 kg/m (steel)
Our Base: 5.2 kg/m (aluminum)
Our Advanced: 4.8 kg/m (hollow-core design)
▲ Base: 48% lighter than steel; easier transport.
▲▲ Advanced: 52% lighter than steel (ideal for mobile use).
Industry Standard: Heavyweight increases labor and equipment costs.
Load CapacityHeavy equipment storageIndustry Standard: 200 kg/m²
Our Base: 250 kg/m² (▲)
Our Advanced: 300 kg/m² (▲▲)
▲ Base: Exceeds OSHA safety standards (250 kg/m²).
▲▲ Advanced: Supports industrial machinery (300 kg/m²).
Industry Standard: Risk of overloading in heavy-duty scenarios.
Noise LevelUrban construction near residential areasIndustry Standard: 50 dBA (steel clatter)
Our Base: 45 dBA (▲)
Our Advanced: 40 dBA (▲▲)
▲ Base: 10% quieter than steel (reduces noise complaints).
▲▲ Advanced: Quieter than a library (40 dBA).
Industry Standard: High noise disrupts nearby communities.
Corrosion ResistanceMarine or chemical plant projectsIndustry Standard: Uncoated steel (rust-prone)
Our Base: Anodized finish (ASTM B137)
Our Advanced: Double-coated (electroplated + powder coat)
▲ Base: 500+ hours salt spray resistance.
▲▲ Advanced: 2,000+ hours salt spray resistance.
Industry Standard: Degrades within 1–2 years in corrosive environments.
Installation EaseTime-sensitive construction projectsIndustry Standard: Requires bolts (15 mins per plank)
Our Base: Fewer bolts (10 mins)
Our Advanced: Tool-free clips (5 mins)
▲ Base: 33% faster assembly.
▲▲ Advanced: 67% faster assembly (tool-free).
Industry Standard: Labor-intensive and time-consuming.

Related searches

The Product Description is generated by third-party, and Alibaba.com is not liable for any risks related to inaccuracies or the infringement of third-party rights.

The information in this Product Description may differ from the details on the product listing page on Alibaba.com. Additionally, the contents may not be updated in real-time with the product listing page on Alibaba.com, and there may be delays in reflecting the most updated information. The description on product listing page takes precedence. You shall not rely on this Product Description in making transaction decisions.

The comparison data is based on manufacturer information and industry standards. Actual results may vary depending on individual use cases. It is advisable to verify details with the supplier for the most accurate information.