Material Construction | Commercial greenhouses, heavy-duty use | Industry Standard: Galvanized steel (ASTM A153, 500+ hours salt spray resistance) Our Base: Galvanized steel (ASTM A153) Our Advanced: Stainless steel (ASTM A240, 1000+ hours salt spray resistance) ▲ | ▲ Advanced: 2× corrosion resistance for coastal climates. Base: Cost-effective durability for standard environments. | Advanced: Higher upfront cost. Base: Requires periodic maintenance in harsh conditions. |
Cover Material Durability | High-wind regions, long-term use | Industry Standard: Film with 12 N/mm² tensile strength (ISO 527) Our Base: Film with 15 N/mm² tensile strength ▲ Our Advanced: Film with 18 N/mm² tensile strength ▲▲ | ▲ Base: 25% stronger than industry norms. ▲▲ Advanced: Withstands 80+ km/h winds. | Base: UV resistance limited to 1,000 hours. Advanced: Heavier, requiring stronger frames. |
Ventilation Mechanism | Small-scale farms, manual labor settings | Industry Standard: Manual cranks (effort: 15 N force) or electric systems Our Base: Manual crank (12 N force ▲) Our Advanced: Smooth-grip ergonomic crank (9 N force ▲▲) | ▲ Base: 20% easier cranking than standard. ▲▲ Advanced: Reduces user fatigue in daily use. | No automation for large-scale greenhouses. |
Ease of Installation | DIY setups, quick deployment | Industry Standard: Requires 2–3 workers and tools Our Base: Tool-free assembly (snap-fit joints) ▲ Our Advanced: Pre-assembled modular units ▲▲ | ▲ Base: 50% faster setup. ▲▲ Advanced: Ready-to-use in 1 hour. | Base: Limited customization. Advanced: Higher cost for pre-assembled kits. |
Weather Resistance | Tropical or high-rainfall areas | Industry Standard: Film with 1,000-hour UV resistance (ASTM G154) Our Base: Film with 1,500-hour UV resistance ▲ Our Advanced: Film with 2,000-hour UV resistance ▲▲ | ▲ Base: 50% longer lifespan in sun exposure. ▲▲ Advanced: Retains 90% clarity after 2 years. | Base: Not ideal for extreme UV zones. |
Cost Efficiency | Budget-conscious growers, small farms | Industry Standard: $150–$200/unit Our Base: $130/unit (15% cheaper) ▲ Our Advanced: $220/unit (includes 5-year warranty) ▲▲ | ▲ Base: Best value for entry-level users. ▲▲ Advanced: Lower long-term maintenance costs. | Advanced: Higher upfront investment. Base: Sacrifices durability for affordability. |