Material Composition | Construction sites, Disaster zones | Industry Standard: Plastic panels (5-year durability) Our Base: Steel frame + sandwich panels (20-year corrosion resistance ASTM A153) ▲ Our Advanced: Reinforced steel + eco-friendly sandwich panels (30-year, ASTM A709) ▲▲ | ▲ Base: 4x longer lifespan than plastic; Advanced: 20% lighter steel for transport | Base: Higher upfront cost vs plastic; Advanced: Requires specialized recycling |
Durability/Warranty | Harsh environments (e.g., mining sites) | Industry Standard: 5-year warranty Our Base: 10-year warranty (ISO 9001) ▲ Our Advanced: 15-year warranty ▲▲ | ▲ Base: Outperforms industry by 100%; Advanced: 3x longer lifespan in corrosive conditions | Base: Limited customization; Advanced: 20% higher price tag |
Portability | Event setups, Temporary housing | Industry Standard: 800kg, no wheels Our Base: 500kg, foldable (ISO 780) ▲ Our Advanced: 400kg + integrated wheels ▲▲ | ▲ Base: 37.5% lighter; Advanced: Reduces deployment time by 50% | Base: Requires forklift for transport; Advanced: Assembly needed for first use |
Hygiene Features | Public parks, Tourist attractions | Industry Standard: Basic ventilation Our Base: Enhanced airflow (10 m³/h) ▲ Our Advanced: HEPA filtration (99.97% particulate removal, ISO 16890) ▲▲ | ▲ Base: 2x better odor control; Advanced: Reduces cross-contamination risks | Base: Requires manual cleaning; Advanced: Higher maintenance costs |
Installation | Disaster response, Outdoor festivals | Industry Standard: 4+ hours with tools Our Base: 1-hour setup (no tools) ▲ Our Advanced: 30-min plug-and-play ▲▲ | ▲ Base: 75% faster deployment; Advanced: Ready in 1/8th the time of industry | Base: Limited to flat terrain; Advanced: Requires power connection |
Certifications | Regulatory compliance (e.g., hospitals) | Industry Standard: Basic safety certs Our Base: CE (EN 12899) ▲ Our Advanced: CE + NSF 61 (water safety) ▲▲ | ▲ Base: Meets EU safety standards; Advanced: FDA-approved for potable water systems | Base: Excludes NSF 61; Advanced: Adds $500 to unit cost |