Material Composition | High-rise buildings, commercial structures | Industry Standard: 5052 aluminum alloy (ASTM B209) Our Base: 6063 aluminum alloy (ASTM B221 ▲) Our Advanced: 6063-T5 with corrosion protection (ASTM B209 ▲▲) | Base: 30% stronger than industry standard; Advanced: 50% improved corrosion resistance (ISO 9227) | Base may require periodic coating for extreme environments; Advanced adds weight |
Surface Treatment | Hospitality, luxury residential | Industry Standard: Anodized finish (ASTM B204) Our Base: Mirror-polished (ISO 8287 ▲) Our Advanced: Mirror-polished + anti-reflective coating (▲▲) | Base: Reduces glare by 40%; Advanced: 98% light reflectivity with anti-reflective clarity (ISO 13032) | Advanced coating may require specialized cleaning (e.g., pH-neutral detergents) |
Acoustic Performance | Office buildings, hospitals | Industry Standard: 25 dB noise reduction (ISO 140-3) Our Base: 28 dB (▲) Our Advanced: 32 dB (▲▲) | Base: Quieter than standard office noise (50 dB); Advanced: Meets hospital ICU standards (▲▲) | Base insufficient for high-noise areas; Advanced requires thicker panels |
Thermal Performance | Hot climates, energy-efficient buildings | Industry Standard: U-value 2.5 W/m²K (ISO 13786) Our Base: 2.0 (▲) Our Advanced: 1.5 (▲▲) | Base: 20% better heat insulation; Advanced: 40% energy savings (per ASHRAE 90.1) | Advanced panels may increase installation costs by 15–20% |
Light Transmission | Retail spaces, atriums | Industry Standard: 30% light transmission (ISO 9050) Our Base: 40% (▲) Our Advanced: 50% (▲▲) with glare control | Base: Reduces artificial lighting needs by 25%; Advanced: Maintains 80% clarity at peak sunlight (▲▲) | Advanced perforations may reduce structural rigidity by 10% |
Customization Options | Architectural projects | Industry Standard: Limited patterns (ASTM C1048) Our Base: 10+ perforation patterns (▲) Our Advanced: Customizable patterns + color options (▲▲) | Base: Meets 90% of standard design needs; Advanced: 100% bespoke designs (per AIA guidelines) | Advanced customization doubles lead time (e.g., 8 weeks vs. 4 weeks) |