Frame Material | Commercial buildings, residential | Industry Standard: Basic aluminum (ASTM B221) Our Base: Aluminum Alloy (6063-T5, 30% stronger) Our Advanced: Aluminum + Wood Composite (EN 13544, 20% lighter) | ▲ Base: Enhanced durability vs standard aluminum ▲▲ Advanced: Lightweight aesthetics (e.g., wood grain finish) | Higher cost for Advanced; wood may require maintenance in humid climates |
Glass Type | Sunrooms, offices | Industry Standard: Standard double-glazed (U-value 2.5) Our Base: Low-E Glass (U-value 1.5) Our Advanced: Triple-Low-E (U-value 1.0) ▲▲ | ▲▲ Advanced: 40% less heat transfer vs standard glass (reduces AC use) Base/Advanced: UV protection (99%) | Advanced: Thicker glass may slightly reduce light transmission (tooltip: "Still 85% visible light transmittance") |
Roof Design | Outdoor spaces, sunrooms | Industry Standard: Flat roof with basic insulation Our Base: Flat Low-E Insulating Glass (R-value 4.0) Our Advanced: Flat Triple-Low-E + Aerogel (R-value 6.0) ▲▲ | ▲▲ Advanced: 50% better thermal resistance than standard roofs Base/Advanced: Seamless indoor-outdoor integration | Advanced: Requires reinforced structure for aerogel panels (tooltip: "Adds 10% to installation cost") |
Noise Reduction | Office buildings, residential | Industry Standard: 30 dB reduction Our Base: 35 dB (ISO 140-3) ▲ Our Advanced: 40 dB (ASTM E90) ▲▲ | ▲▲ Advanced: Quieter than a library (40 dB vs 45 dB standard) Base: Ideal for open-plan offices (tooltip: "35 dB: comparable to a quiet café") | Advanced: Heavier frames may affect architectural design flexibility |
Eco-Friendly Features | Hotels, commercial buildings | Industry Standard: Basic recyclability Our Base: 80% Recycled Content (EPR Germany) ▲ Our Advanced: Carbon-Neutral Production ▲▲ | ▲▲ Advanced: Meets LEED Gold certification requirements Base: Reduces landfill waste by 50% | Advanced: Limited suppliers for carbon-neutral materials (tooltip: "Available in EU markets only") |
Certifications | Government projects, luxury homes | Industry Standard: Local building codes Our Base: EPR Germany Packing ▲ Our Advanced: AS2047 (Australia) + EPR ▲▲ | ▲▲ Advanced: Eligible for global tenders (e.g., EU and APAC markets) Base: Meets EU recycling mandates | Advanced: Requires third-party audits (tooltip: "Adds 2-3 weeks to delivery time") |