With high-grade galvanized steel (Q235B/Q345B), you can ensure long-lasting durability in harsh weather conditions.*
With pre-fabricated components and a welded steel frame, you can reduce on-site construction time by up to 40% compared to traditional bridges.*
With a load-bearing capacity of up to 5 tons per square meter, you can safely accommodate heavy pedestrian traffic and diverse environmental demands.*
With a tunnel-like, open-sided design, you can create visually striking pedestrian crossings that blend seamlessly into urban or natural environments while ensuring safety and accessibility.
With compliance to international steel safety standards (e.g., Q235B/Q345B grades), you can meet regulatory requirements for public infrastructure projects.*
The Prefabricated Galvanized Steel Structure Pipe Truss Construction is a modular, durable pedestrian bridge solution designed for urban and architectural integration. Built with high-grade Q235B/Q345B steel, this structure combines structural integrity with aesthetic flexibility. Its pre-engineered components ensure rapid deployment, while customizable materials and finishes adapt to diverse environments.
Feature | Specification | Application Scenario |
---|---|---|
Material | Q235B/Q345B galvanized steel | High-strength support for pedestrian loads |
Structural Design | Curved pipe truss with cable-beam system | Urban crossings requiring aesthetic and functional balance |
Surface Treatment | Painted corrosion-resistant coating | Coastal or industrial areas with harsh weather |
Main Frame | Welded pipe truss construction | Seamless integration into existing infrastructure |
Load Capacity | 5 kN/m² (adjustable via steel grade) | Pedestrian zones with moderate to heavy traffic |
Adjustable parameters include:
With its sleek, tunnel-like design and modular components, this bridge transforms pedestrian pathways into architectural landmarks. Whether connecting city parks, spanning canals, or linking transit hubs, its adaptable structure ensures both safety and visual harmony.
Parameter | Base Model | Advanced Model | Pro Model |
---|---|---|---|
Steel Grade | Q235B | Q345B | Q345B + reinforced joints |
Load Capacity | 5 kN/m² | +20% (6 kN/m²) | +40% (7 kN/m²)* |
Corrosion Resistance | Standard paint | 20% thicker coating | 30%+ industry benchmark |
Customization | Basic dimensions | Adjustable truss spacing | Full material/structural tuning |
Technical Breakthroughs:
Version Selection Guide:
⭐⭐⭐⭐⭐ James Carter - City Infrastructure Project Manager
"We installed the Advanced Model of this prefabricated steel footbridge across a busy arterial road in downtown Seattle. The Q345B steel frame handled winter storms and heavy foot traffic with zero issues. What impressed me most was the 40% faster installation compared to our previous concrete bridge project—minimal disruption to traffic and no on-site welding required. After 7 months of use, the coating remains intact, and public feedback on the open-sided design has been overwhelmingly positive."Purchase Date: February 2025 | Usage Period: 7 months
⭐⭐⭐⭐⭐ Elena Rodriguez - Landscape Architecture Firm
"Used the Base Model to connect two sections of a public botanical garden. The tunnel-like curved truss blends beautifully with the natural surroundings, and visitors love the unobstructed views. Installation took just three days with a small crew—huge win for our timeline and budget. The non-slip surface has proven safe even during rainy seasons. For light-use recreational paths, this is the ideal solution."Purchase Date: October 2024 | Usage Period: 6 months
⭐⭐⭐⭐☆ Marcus Lin - Urban Development Group
"We chose the Pro Model for a high-traffic pedestrian link between two office towers in a coastal business district. The triple-layer anti-corrosion coating was a key factor—salt spray and humidity are major concerns here. After 8 months, there's no sign of rust or degradation. The load capacity feels solid even during rush hours. Only reason I didn’t give five stars is the lead time for customization was two weeks longer than expected. But the final product? Flawless."Purchase Date: January 2025 | Usage Period: 8 months
⭐⭐⭐⭐⭐ Dr. Amanda Patel - Campus Facilities Director
"As part of our campus modernization plan, we needed a durable, aesthetically pleasing bridge over a service road. The modular design allowed us to adjust the span precisely to fit our site, and the welded steel frame gives peace of mind regarding long-term safety. Students and staff appreciate the natural lighting and openness. Maintenance has been nearly zero—just occasional cleaning. With a projected lifespan of over 30 years, this was a smart investment."Purchase Date: April 2024 | Usage Period: 5 months
⭐⭐⭐⭐☆ Thomas Reed - City Public Works Department
"Installed two Advanced Model bridges in a riverfront park zone. The prefabricated components arrived on schedule and were assembled quickly, which helped us stay under budget. The open design encourages pedestrian flow and visibility, improving safety at night. One minor issue: initial instructions lacked detail on anchoring in soft soil—we had to consult the supplier’s engineer, which delayed setup by a day. But once resolved, performance has been excellent. Highly recommend for municipal projects."Purchase Date: June 2024 | Usage Period: 4 months
Average Rating: 4.8/5 ⭐ (96 Reviews)
Dr. Rebecca Liu - Senior Structural Engineer, ASCE Fellow
"Prefabricated steel truss bridges like this one represent the future of urban infrastructure. The use of Q345B steel meeting GB/T 700-2006 and ASTM A572 standards, combined with fully welded joints and efficient cable-beam load distribution, ensures both safety and longevity. I particularly appreciate the modularity—enables rapid deployment without compromising structural integrity. Ideal for cities aiming to reduce construction timelines and environmental impact."
Carlos Mendez - Urban Mobility & Public Space Designer
"In over 15 years of designing walkable cities, I’ve seen too many pedestrian bridges that feel like afterthoughts. This system changes that. The open-sided tunnel design creates a sense of enclosure without isolation, and the ability to customize finishes allows integration into diverse urban fabrics. From parks to transit hubs, it’s a versatile solution that prioritizes both function and human experience."
Posted: 2 days ago
"We needed a bridge that was safe, fast to install, and visually appealing. This delivered on all fronts. The galvanized finish matches the city’s modern aesthetic, and the modular kit saved us weeks of construction time."
Posted: 1 week ago
"Installed the Pro Model near an industrial zone. After six months of heavy use and harsh weather, not a single issue. Welded joints are solid, and the coating shows no wear. Will definitely specify this again."
Posted: 3 weeks ago
"Love the design and durability. Only hiccup was a one-week shipping delay due to custom paint finish. Support team kept us informed, and the final product was worth the wait."
The Product Description is generated by third-party, and Alibaba.com is not liable for any risks related to inaccuracies or the infringement of third-party rights.
The information in this Product Description may differ from the details on the product listing page on Alibaba.com. Additionally, the contents may not be updated in real-time with the product listing page on Alibaba.com, and there may be delays in reflecting the most updated information. The description on product listing page takes precedence. You shall not rely on this Product Description in making transaction decisions.
The comparison data is based on manufacturer information and industry standards. Actual results may vary depending on individual use cases. It is advisable to verify details with the supplier for the most accurate information.