Material & Construction | Aircraft maintenance/storage | Industry: Concrete/wood (no corrosion spec) Our Base: Light steel (ASTM A53 corrosion resistance) ▲ Our Advanced: Galvanized steel (ASTM B117, 2000+ salt spray hours) ▲▲ | Enhanced durability and corrosion resistance over concrete/wood. Lightweight yet robust structure. | Higher cost for Advanced version. |
Design & Aesthetics | Corporate image, visitor access | Industry: Plain, functional design Our Base: Glass panels (ISO 12543 clarity) ▲ Our Advanced: Curved roof + customizable glass (EN 12543-1) ▲▲ | Modern aesthetics, natural light (reduces energy costs). Improved visibility for aircraft monitoring. | Glass requires occasional cleaning; may add to maintenance costs. |
Certifications | Global deployment | Industry: No certifications Our Base: CE (EN 1993 compliance) ▲ Our Advanced: CE + ISO 9001 (quality management) ▲▲ | Guaranteed safety and compliance with international standards. Streamlines regulatory approvals. | Certification costs increase upfront investment. |
Thermal Insulation | Extreme climates (e.g., Arctic regions) | Industry: Minimal (R-10 insulation) Our Base: R-20 (ISO 8990) ▲ Our Advanced: R-30 + vapor barrier (ASTM C518) ▲▲ | Maintains stable internal temperatures, reduces energy consumption. Protects aircraft from humidity/dew. | Advanced version adds weight, requiring stronger foundations. |
Installation Speed | Urgent deployment (e.g., disaster zones) | Industry: 6-8 weeks (traditional on-site) Our Base: 2-3 weeks (prefab, ISO 15613) ▲ Our Advanced: 1 week (automated systems) ▲▲ | Rapid setup minimizes downtime for critical operations. Reduces labor and logistical costs. | Limited applicability in remote areas without infrastructure. |
Customization & Flexibility | Multi-use facilities (e.g., workshops/hotels) | Industry: Single-purpose design Our Base: Modular (adaptable to warehouses/offices) ▲ Our Advanced: Full BIM customization (any layout) ▲▲ | Versatile for diverse applications (e.g., storage, events, offices). Reduces need for multiple buildings. | Customization may increase lead time and require specialized planning. |