Material & Construction | Industrial storage, corrosion-prone environments | Industry Standard: Basic carbon steel (ASTM A36) Our Base: ASTM A36 steel (20mm thickness) Our Advanced: ASTM A572 Grade 50 steel (25mm thickness)▲ | ▲ Advanced: 25% higher tensile strength (ASTM A572) Corrosion resistance via galvanized coating | Base: Heavier weight ▲ Advanced: Higher cost due to premium steel |
Silo Design (Shape & Base) | Bulk material storage (cement, grains) | Industry Standard: Flat-bottomed cylindrical silos (risk of material buildup) Our Base/Advanced: Conical base (60° slope)▲ ISO 10413 compliance | ▲ Advanced: 30% faster discharge efficiency (reduced clogging) Space-optimized cylindrical shape | Higher upfront cost compared to flat-bottom designs |
Ventilation System | Moisture-sensitive material storage | Industry Standard: Passive vents (moisture buildup risk) Our Base: 800 CFM forced-air ventilation (ISO 15898) Our Advanced: 1200 CFM + humidity sensors▲ | ▲ Advanced: Real-time moisture control (≤12% RH) Prevents mold/spoilage | Advanced requires regular sensor calibration |
Noise Level | Urban/office-adjacent installations | Industry Standard: 55 dBA (louder than a lawnmower) Our Base: 43 dBA (quieter than a refrigerator hum) Our Advanced: 38 dBA▲ | ▲ Advanced: Meets OSHA workplace noise standards (≤40 dBA) Reduces environmental disruption | Advanced requires premium sound-dampening materials |
Warranty & Support | Long-term operational reliability | Industry Standard: 6-month warranty Our Base: 12-month warranty + basic maintenance Our Advanced: 24-month warranty + predictive maintenance▲ | ▲ Advanced: 24/7 remote diagnostics via IoT sensors Lower downtime risk | Base lacks advanced predictive analytics tools |
Power Source & Efficiency | Grid-dependent vs. hybrid energy use | Industry Standard: Diesel-powered systems (high emissions) Our Base: Electric (IE3 energy-efficient motor) Our Advanced: Solar + electric hybrid▲ | ▲ Advanced: 40% lower energy costs (ISO 50001 compliant) Eco-friendly operation | Advanced requires solar panel installation costs |