Blade Material | Residential installations | Industry Standard: Fiberglass (ASTM D790 flexural strength: 400 MPa) Our Base: Nylon Fiber (ASTM D638 tensile strength: 70 MPa) Our Advanced: Carbon Fiber (ASTM D3039 tensile strength: 1500 MPa) | ▲ Lightweight (Nylon reduces weight by 30% vs fiberglass) ▲ Advanced: Ultra-durable (Carbon Fiber withstands extreme weather) | Base: Lower strength than fiberglass (requires frequent checks) Advanced: Higher cost (+40% vs base) |
Generator Type | Off-grid homes, small businesses | Industry Standard: Induction Generator (efficiency: 70-80%) Our Base/Advanced: Permanent Magnet Generator (efficiency: 85-95%) | ▲ Higher energy output (Permanent magnets reduce energy loss) ▲ Compact design saves space | Higher upfront cost than induction generators (Base: +20% premium) |
Noise Level | Urban/residential areas | Industry Standard: 50 dBA (comparable to a busy street) Our Base: 40 dBA (quieter than a whisper) Our Advanced: 35 dBA (library-level quiet) | ▲ Ideal for noise-sensitive areas (e.g., apartments) ▲ Advanced: Meets EU urban noise regulations | Advanced: Requires specialized blade coatings (adds to maintenance) |
Output Voltage | Multi-device setups (lights, appliances) | Industry Standard: Fixed 12V output Our Base: 12V/24V adaptable Our Advanced: 12V/24V/48V universal | ▲ Flexibility for diverse electronics (e.g., solar hybrid systems) ▲ Advanced: Direct compatibility with EV charging stations | Base: Limited to lower-power devices without converters |
Power Capacity | Medium-energy households | Industry Standard: 500W (powers basic lighting) Our Base: 1kW (1000W rated power) Our Advanced: 2kW (2000W peak) | ▲ Base: Powers home essentials (fridges, Wi-Fi) ▲ Advanced: Supports HVAC systems | Advanced: Requires stronger structural support (+20% tower cost) |
Certifications | Export/commercial projects | Industry Standard: CE only Our Base: CE + EPR Germany/France (complies with EU waste regulations) Our Advanced: CE + EPR + IEC 61400-25 (international grid compatibility) | ▲ Base: Streamlined EU market entry ▲ Advanced: Global deployment (e.g., Asia-Pacific grids) | Advanced: Lengthy certification process (adds 3-6 months to delivery) |