Sound Absorption Efficiency | Gyms, theaters, open-plan offices | Industry Standard: NRC 0.5 (ISO 354) Our Base: NRC 0.7 (▲) Our Advanced: NRC 0.9 (▲▲) | Reduces echo by 40% (Base) to 70% (Advanced) Ideal for speech clarity | Higher NRC correlates with increased cost (Advanced: +25% premium) |
Structural Rigidity | High-traffic areas, warehouses | Industry Standard: Steel frame (ASTM A36) Our Base: Aluminum (6061-T6) Our Advanced: Reinforced aluminum + composite core (▲) | 30% lighter than steel (eases installation) Withstands 500+ cycles (ISO 14348) | Advanced version requires specialized maintenance |
Ease of Installation | Event venues, temporary spaces | Industry Standard: 8–10 hours (manual assembly) Our Base: 4 hours (modular clips) Our Advanced: 2 hours (motorized tracks ▲▲) | Reduces labor costs by 50% (Advanced) Zero-tool assembly | Advanced system requires electrical wiring (+$500 setup) |
Fire Resistance | Schools, hospitals | Industry Standard: Class B (ASTM E84) Our Base: Class A (▲) Our Advanced: Fireproof coating (2-hour rating ▲) | Meets NFPA 101 for public spaces No need for additional fire barriers | Advanced coating adds 15% weight |
Weight & Portability | Rental spaces, pop-up stores | Industry Standard: 35 kg/panel Our Base: 28 kg (aluminum ▲) Our Advanced: 22 kg (hollow-core design ▲▲) | 37% lighter than competitors Manual movement feasible for Base Advanced: Motorized glide system | Base version requires 2 people for reconfiguration |
Certifications & Compliance | International projects | Industry Standard: Local certifications only Our Base: CE, ASTM F739 (▲) Our Advanced: CE, ASTM, ISO 14001 (▲▲) | Global deployment eligibility Chemical resistance (50+ substances) | Advanced certification adds 10% to production time |