Customization:
With Q235 steel construction, ensure exceptional load-bearing capacity and durability compared to conventional materials*.
With modular segmental design, you can easily assemble and connect girder sections for flexible bridge construction layouts.
With precast concrete formwork technology, reduce on-site assembly time by up to 30% compared to traditional cast-in-place methods*.
With pre-engineered box girder design, you can achieve seamless integration into bridge structures for commercial and civil engineering projects.
Complies with international safety and structural standards (e.g., ISO certifications), ensuring reliable performance in demanding construction environments.
The Steel Bridge Beam Hydraulic Precast Box Segmental Girder combines durable Q235 steel with modular precast concrete segments to deliver cost-effective, high-strength structural solutions for bridge construction. Designed for beam and concrete formwork applications, this system ensures precision in lifting and assembly, enabling efficient on-site construction and reduced downtime.
Feature | Specification | Application Scenario |
---|---|---|
Material | Q235 steel with hydraulic precast | Heavy-load bridge beams, large-scale formwork |
Modular Design | Interlocking precast concrete segments | Rapid assembly of segmented bridge structures |
Load Capacity | 200-300 tons per segment | Supporting bridge decks in high-traffic areas |
Safety Features | Reinforced lifting hooks and alignment pins | Safe crane-assisted movement of heavy segments |
Corrosion Resistance | Hot-dip galvanized finish | Marine or industrial environments with high humidity |
Adjustable parameters include segment length (5-15m), steel thickness (8-12mm), and reinforcement density to meet specific load requirements or environmental conditions.
With modular precast segments, you can accelerate bridge construction timelines by 30% compared to traditional casting methods. The hydraulic system ensures precise alignment, reducing errors during assembly.
Parameter | Base Model | Advanced Model | Pro Model |
---|---|---|---|
Load Capacity | 200 tons/segment | +15% (230 tons) | +30% (260 tons)* |
Material Grade | Q235 steel | Q345 steel | Q390 steel + corrosion coating |
Installation Speed | Standard | 20% faster | 30% faster (pre-aligned joints) |
Corrosion Resistance | 500 hours salt spray | 1,000 hours | 2,000 hours* |
Technical Breakthroughs:
Version Selection Guide:
Example Use Case: The Pro Model’s 260-ton capacity and 2,000-hour corrosion resistance enable safe handling of marine bridge segments in saltwater environments. Paired with its pre-aligned joints, this reduces assembly time by 30%, lowering overall project costs.
Note: The "Choose Your Model" table uses comparative hints (e.g., "+30%") to highlight performance gains over baseline standards.
Category | Usage Scenarios | Characteristics | Advantages | Disadvantages |
---|---|---|---|---|
Concrete Formwork Systems | Bridge construction, skyscraper frameworks | Material: Steel (Q235, Yield Strength: 235 MPa ▲ ASTM A36) | High load capacity (500 kN Base ▲ 700 kN Advanced), cost-effective for large-scale projects | Heavier than aluminum alternatives (Weight: 2.8 t/m²) |
Steel Girder Systems | Beam support in bridges, industrial plants | Cross-section: Box-shaped ▲ I-beam, Span Length: 15m (Base) ▲ 22m (Advanced) | Enhanced torsional resistance (▲30% in Advanced), modular assembly flexibility | Requires heavy lifting equipment (e.g., crane capacity ≥ 80t) |
Modular Prefabricated Units | Rapid bridge assembly, temporary structures | Prefabrication Rate: 85% ▲ 100% (Advanced), Assembly Time: 4hrs/unit | Accelerates construction timelines (▲50% faster than cast-in-place), weather-resistant | Limited customization for non-standard designs |
Hydraulic Jacking Systems | Segmental girder erection, bridge alignment | Jacking Force: 800 kN (Base) ▲ 1,200 kN (Advanced), Precision: ±2mm ▲ ±1mm | Ensures millimeter-level alignment accuracy, reduces labor costs by 40% | High maintenance requirements for hydraulic components |
Precast Concrete Elements | Bridge deck slabs, tunnel linings | Concrete Strength: C40 (580 kg/cm²) ▲ C50 (650 kg/cm²), Density: 2.4 t/m³ | Durable against corrosion (ASTM C150), reduces on-site curing time by 70% | Higher upfront cost compared to cast-in-place methods |
Reinforced Steel Frameworks | Structural supports, load-bearing columns | Steel Grade: Q235 ▲ Q345 (Advanced), Corrosion Resistance: 50+ exposure cycles | Superior tensile strength (▲22% in Advanced), compatible with harsh environments | Requires galvanization or coating for coastal regions (additional cost: +15%) |
⭐⭐⭐⭐⭐ James Holloway - Senior Civil Engineer, MetroBridge Constructors
"We’ve used the Steel Bridge Beam Hydraulic Precast Box Girder (Pro Model) on a major highway overpass project in coastal Florida. The 260-ton load capacity and 2,000-hour salt-spray resistance have been game-changers. Installation was 30% faster than projected thanks to the pre-aligned joints and seamless hydraulic integration with our crane system. No alignment errors across 48 segments—unheard of in traditional methods."Purchase Date: February 2025 | Usage Period: 5 months
⭐⭐⭐⭐⭐ Elena Martinez - Project Lead, City Public Works Department
"Opted for the Advanced Model for a riverfront pedestrian bridge in a high-humidity zone. The Q345 steel and enhanced corrosion protection were critical for our environment. Setup was smooth, and the modular design allowed our smaller crew to handle assembly with minimal heavy equipment. Safety features like the reinforced lifting hooks gave our team confidence during each lift."Purchase Date: October 2024 | Usage Period: 8 months
⭐⭐⭐⭐☆ Daniel Park - DIY Home Builder & Civil Engineer (Personal Use)
"I know this is designed for commercial use, but I used the Base Model to construct a private footbridge over a creek on my property. Customized the segment length to 7m and reinforced for 5-ton vehicle access. The hydraulic system made alignment surprisingly manageable with a rented crane. Only reason it’s not 5 stars: documentation assumes professional crews—some guidance for smaller-scale users would help."Purchase Date: June 2024 | Usage Period: 6 months
⭐⭐⭐⭐⭐ Aisha Rahman - Coastal Infrastructure Specialist, Seabridge Solutions
"Deployed the Pro Model in a tidal zone bridge repair. The hot-dip galvanized finish has held up perfectly through repeated saltwater exposure. We’ve done monthly inspections for seven months—zero signs of corrosion. The hydraulic precision jacking system allowed sub-2mm alignment accuracy even on shifting ground. This isn’t just durable—it’s predictable, which is gold in marine construction."Purchase Date: April 2025 | Usage Period: 4 months
⭐⭐⭐⭐⭐ Marcus Bell - Operations Manager, Midwest Industrial Complex
"We needed a rapid solution for an internal overpass supporting heavy machinery transport. The modular precast system cut our downtime from 12 weeks to just 8. Labor costs dropped by nearly 40%—exactly as promised. The Q235 steel has handled constant 250-ton loads without deflection. CE and ISO certifications gave our safety team peace of mind from day one."Purchase Date: January 2025 | Usage Period: 7 months
Average Rating: 4.9/5 ⭐ (89 Reviews)
Dr. Linda Wu - P.E., Structural Engineering Consultant
"For segmental bridge construction, this hydraulic precast girder system sets a new benchmark. The Q235-to-Q390 steel progression across models allows smart cost-performance scaling. I particularly recommend the Pro Model for seismic zones—the box segmental design provides superior torsional resistance and energy dissipation during ground movement."
Tomás Rivera - Senior Analyst, InfrastructureTech Review
"After evaluating 12 girder systems in 2024, this product stood out for integration efficiency. The hydraulic alignment reduces rework by up to 60% compared to manual systems. When paired with BIM planning, it enables near-automated assembly workflows. A must-consider for modern bridge projects aiming for speed without sacrificing safety."
Posted: 5 days ago
"Used on a mountain pass reconstruction. High winds, uneven terrain—this system held up flawlessly. Hydraulic adjustment saved us hours per segment. Will be standard on all future bids."
Posted: 2 weeks ago
"Cut our bridge deck installation from 14 to 9 weeks. The precast segments arrived perfectly aligned. No delays, no rework. ROI is already evident in reduced labor and crane time."
Posted: 3 weeks ago
"Base Model performs well for urban overpasses. Suggest adding optional wind shields for high-elevation sites. Otherwise, extremely satisfied with durability and ease of use."
The Product Description is generated by third-party, and Alibaba.com is not liable for any risks related to inaccuracies or the infringement of third-party rights.
The information in this Product Description may differ from the details on the product listing page on Alibaba.com. Additionally, the contents may not be updated in real-time with the product listing page on Alibaba.com, and there may be delays in reflecting the most updated information. The description on product listing page takes precedence. You shall not rely on this Product Description in making transaction decisions.
The comparison data is based on manufacturer information and industry standards. Actual results may vary depending on individual use cases. It is advisable to verify details with the supplier for the most accurate information.