Frame Material | Outdoor/Indoor installations | - Industry Standard: uPVC (R-value 2.8) - Our Base: Aluminum+PVC hybrid (R-value 3.2) - Our Advanced: Thermal-break aluminum+PVC (R-value 3.8) ▲ | ▲ Base: 14% better insulation than standard. ▲ Advanced: 35% lighter than all-aluminum frames. | Advanced: 20% higher cost due to thermal-break tech. |
Thermal Insulation | Hot climates/residential buildings | - Industry Standard: Single-pane glass (U-value 3.0) - Our Base: Double-pane (U-value 1.8) ▲ - Our Advanced: Triple-pane + argon gas (U-value 0.8) ▲▲ | ▲ Base: Cuts AC usage by 25%. ▲▲ Advanced: Maintains 70% indoor temp stability in 40°C heat. | Advanced: Adds 30% to window weight. |
Soundproofing | Near highways/noisy areas | - Industry Standard: 30 dB reduction - Our Base: 35 dB reduction (ISO 140-3) ▲ - Our Advanced: 43 dB reduction (meets STC 45) ▲▲ | ▲ Base: Quieter than a refrigerator hum (30 dB). ▲▲ Advanced: Blocks most traffic noise (43 dB ≈ library quietness). | Advanced: Requires reinforced framing for stability. |
Screen Netting | Insect-prone regions | - Industry Standard: Polyester (500-hour UV resistance) - Our Base: Fiberglass (2,000-hour UV resistance) ▲ - Our Advanced: Fiberglass+anti-mosquito coating (5,000-hour UV) ▲▲ | ▲ Base: 4× longer lifespan vs polyester. ▲▲ Advanced: 99.8% insect blockage (tested per ASTM E2166). | Advanced: Cleaning requires specialized tools. |
Curtain Type | Modern homes/leisure facilities | - Industry Standard: None - Our Base: Roller blind (light control) ▲ - Our Advanced: Motorized roller + magnetic blackout layer ▲▲ | ▲ Base: Reduces glare by 60%. ▲▲ Advanced: Blocks 99% light (ideal for media rooms). | Advanced: Requires electrical wiring. |
Customization | Farmhouse/heritage-style buildings | - Industry Standard: Basic grille patterns - Our Base: Optional grille + 5 color finishes ▲ - Our Advanced: Custom grille designs + 20+ finishes ▲▲ | ▲ Base: Matches 80% of farmhouse aesthetics. ▲▲ Advanced: Architectural awards-winning designs (e.g., Arts & Crafts). | Advanced: 4–6 week lead time for custom orders. |