Material Composition | Industrial waterproofing, construction | Industry Standard: Asphalt/PVC blends (ASTM D5199) Our Base: Rubber + cement (ASTM C1580) Our Advanced: Nano liquid-enhanced rubber/cement (ISO 15608) | ▲ Base: Lightweight (2.5kg/m² vs 3.2kg/m²) ▲ Advanced: 30% stronger adhesion (ASTM D412) | Base: Moderate UV resistance (3 years) Advanced: Higher cost (+25%) |
Waterproofing Performance | Flood-prone areas, basements | Industry Standard: 1.5m water pressure resistance (ASTM E514) Our Base: 3m resistance (ASTM C1202) Our Advanced: 5m resistance (ISO 19277) | ▲ Base: 100% impermeable under 3m pressure ▲ Advanced: Zero leakage at 5m (ideal for tunnels) | Base: Requires primer Advanced: Complex application process |
Durability | High-traffic surfaces, outdoor structures | Industry Standard: 5-year warranty (ASTM D582) Our Base: 10-year warranty (ASTM D6114) Our Advanced: 15-year warranty (ISO 13893) | ▲ Base: 50% longer lifespan vs standard ▲ Advanced: Resists abrasion (ASTM D4060: 200 cycles) | Base: Moderate temperature tolerance (-10°C to 50°C) Advanced: Limited color options |
Application Method | Large-scale projects, curved surfaces | Industry Standard: Brush/roller (ISO 2812) Our Base: Spray (ISO 12944) Our Advanced: Automated robotic spray (ISO 15608) | ▲ Base: 40% faster application ▲ Advanced: 95% material efficiency (reduces waste) | Base: Requires skilled labor Advanced: High equipment cost |
Environmental Resistance | Coastal regions, chemical exposure | Industry Standard: Resists 20°C temperature fluctuation (ASTM D822) Our Base: -20°C to 70°C (ASTM D471) Our Advanced: -30°C to 80°C (ISO 1408) | ▲ Base: Withstands 50+ chemical exposures (ASTM D543) ▲ Advanced: UV-resistant for 10 years (ASTM G154) | Base: Moderate fire resistance Advanced: Requires protective gear during installation |
Cost Efficiency | Budget-sensitive projects, long-term use | Industry Standard: $12/m² (5-year TCO) Our Base: $15/m² (8-year TCO) Our Advanced: $22/m² (15-year TCO) | ▲ Base: 30% lower maintenance cost ▲ Advanced: 50% lower lifecycle cost | Base: Higher upfront cost vs standard Advanced: Requires training for installation |