(732 products available)
Liebherr tower cranes are an integral component of major construction projects, especially high-rise buildings. They come in various types to suit different construction needs and project parameters.
Specification
Liebherr tower cranes are designed to lift various maximum loads. The maximum load capacity of the Liebherr tower crane is often indicated in metric tons.
Liebherr tower cranes can cover a certain horizontal distance from the center of the tower to the outer tip of the jib. This is referred to as the jib length or horizontal reach, and it is measured in meters or feet. The jib length is an important specification because it indicates the working range of the crane.
Hook height refers to the distance from the ground to the crane's lifting hook when the crane is fully extended and upright. Hook height determines the maximum height to which the crane can lift objects.
The hoist speed of a Liebherr tower crane is the speed at which the crane's hoist mechanism can raise or lower a load. Hoist speed is typically measured in meters or feet per minute. The hoist speed of a crane is an important specification, as it determines how quickly the crane can perform lifting operations.
Liebherr tower cranes' slewing speed is the speed at which the crane can rotate or swing its superstructure. Slewing speed is usually measured in degrees per minute and indicates how fast the crane can reposition itself. A faster slewing speed enables the crane to quickly and efficiently move to the desired working position.
Power source is the type of energy that powers the Liebherr tower crane. Tower cranes are commonly powered by electricity or diesel. The power source determines how the crane is powered and affects the crane's performance and environmental impact.
The controller system of a Liebherr tower crane is the technology that manages and coordinates the crane's movements and functions. The controller system uses computerized controls to ensure the safe and precise operation of the crane.
Maintenance
A well-maintained tower crane is vital for safety and performance in construction operations. Here are some key Liebherr tower Crane maintenance tips:
It is necessary to do a regular inspection of the tower crane. The inspection includes conducting a visual check of the crane's components and systems to look for signs of damage, wear, or malfunction. The inspection should also be performed by qualified technicians to ensure all functions are working as per the crane's manual. This will help to identify and address any maintenance needs or safety hazards promptly.
Implement a regular preventive maintenance program for the tower crane. This includes following the manufacturer's maintenance schedule and guidelines for lubrication, fluid checks, and component inspections. Regular maintenance will help keep the crane in optimal condition, prevent unexpected breakdowns, and prolong its service life.
Pay attention to the maintenance of essential components like the hoist system, slewing mechanism, and electrical system. This includes ensuring proper lubrication of moving parts, inspecting wire ropes for wear and damage, and checking electrical connections for tightness. Proper component care will help maintain the tower crane's reliability and safety during operation.
Environmental factors can affect the tower crane's performance and condition. Protect the crane from exposure to harsh weather conditions, excessive dust, or corrosive substances. Also, ensure the proper storage of spare parts and maintenance tools to prevent damage and ensure they are readily available when needed. Environmental protection measures will help preserve the integrity and longevity of the crane.
Liebherr tower cranes are widely utilized in many industries, especially in construction and other fields. Here are some common application scenarios of these cranes:
When constructing high-rises, Liebherr tower cranes will be used to lift and move heavy materials to the desired locations. These materials include steel beams, concrete panels, pre-fabricated elements, etc.
During the construction of bridges or dams, the Liebherr tower cranes will be used to transport and place large and heavy components. The cranes can precisely position elements such as bridge segments, beams, and dam sections.
When installing and maintaining wind turbines, Liebherr tower cranes are often used. They will lift the turbine components, such as the tower sections, nacelles, and rotor blades, to great heights. Besides, the cranes will also be used to transport maintenance personnel and equipment to the top of the wind turbines.
In shipyards or ports, Liebherr tower cranes are useful tools. They can handle large and heavy ship components, such as hull sections, machinery, and containers. Moreover, they will be used to load and unload cargo from vessels.
When drilling water wells, Liebherr tower cranes are also necessary equipment. They will be used to lift and lower the drill rig components, casings, and pumps. The cranes can help position the drilling equipment with precision and control.
Mining and quarrying are also common applications of Liebherr tower cranes. They will be used to extract and transport materials such as coal, ore, and aggregates. The cranes can load material into trucks or processing equipment.
When selecting a Liebherr tower crane, it is crucial for business buyers to consider the following aspects to ensure the appropriate model for their application needs and project requirements.
When selecting a Liebherr tower crane, it is necessary to understand the project requirements and determine the specifications needed, such as lifting capacity, maximum boom length, and radius. Additionally, it is also crucial to assess the project site conditions, including the terrain, space limitations, and height requirements, to ensure the selected Liebherr tower crane model is suitable for the project.
For large-scale construction projects, such as high-rise buildings, business buyers may need to choose a Liebherr tower crane with a higher lifting capacity to meet the demand for heavy lifting. Furthermore, it is also necessary to evaluate the crane's hoisting speed and control system to ensure the efficient operation of the project.
Liebherr tower cranes are efficient and can be used in a variety of project scenarios. Business buyers should choose a model that is suitable for their needs based on whether it can be flexibly transported to different project sites and assembled easily. Moreover, it is also necessary to consider the ease of maintenance and after-sales support of the Liebherr tower crane to ensure smooth operation and timely service support during the project.
Business buyers need to evaluate the overall cost of the Liebherr tower crane, including the initial purchase cost, transportation, assembly, and maintenance expenses. It is necessary to opt for a model that provides a good balance between performance and cost-effectiveness based on the project budget and duration. Furthermore, business buyers can also consider the rental options of Liebherr tower cranes for shorter project durations to save costs.
Q1: What is the maximum weight a tower crane can lift?
A1: The maximum weight a tower crane can lift depends on the specific model and configuration. Small or medium-sized tower cranes typically have a maximum lifting capacity ranging from a few tons to over 20 or 30 tons. Larger models feature even higher lifting capacities, which can be up to 20 metric tons or more. It is worth noting that the maximum lifting capacity is usually at the jib's tip and might be significantly less when the crane's jib is extended to a different radius.
Q2: How does a tower crane move?
A2: A tower crane travels between fixed anchor points on the ground. The process is called "crane jumping." It involves adding a new section of the tower and then dismantling the higher sections while the crane is not in use. This method allows the crane to be raised to the required height during the construction project. The counterweights at the back of the crane provide balance and stability as it moves and lifts heavy loads. To relocate the crane on the same level, the operator uses the slewing unit to turn the crane in the desired direction.
Q3: How are tower cranes assembled?
A3: The assembly of a tower crane is a very detailed and time-consuming process that requires careful planning and coordination. Some of the main steps include: preparing the foundation, erecting the base tower section, adding the mast sections, installing the slewing unit, attaching the jib, and finally, installing the counterweights. Additionally, it is very important to observe safety procedures and guidelines throughout the assembly process.