(42 products available)
A tower crane is an enormous crane commonly found on the sites of tall buildings. Its design is similar to a narrow tower with a horizontal arm attached to the top. The crane works just like a ground-based crane, but its height can be extended by adding more sections to the mast. The QLMC tower crane has different types that work best for different situations and projects.
QLM Fixed Tower Crane:
A QLMC fixed tower crane is a large vertical machine built like a tall tower with a horizontal jib attached to it. The vertical part of the crane is called the mast, which is firmly placed on the ground or attached to a tall building. It has a trolley on the horizontal jib that moves loads from one point to another. A keyway or notch can be used to lower the load in a fixed position. The loads can be lowered through the notch in a safe way from the crane by using a remote control. The remote control is often used by crane operators to make the job easier and safer. The job of the fixed tower crane is to lift and move heavy materials, like steel and concrete, and put them in the right places to build tall buildings.
QLM Top Slewing Crane:
A QLMC top slewing tower crane is a large vertical lifting machine built like a tall rectangular tower with a horizontal jib attached to it. It works by rotating its jib around the tower (mast) to lift heavy materials, like steel and concrete, and lower them in the right place to construct tall buildings. The vertical part of the crane is called the mast, which can be constructed higher by adding more sections to it. A top climbing crane and a bottom climbing crane are two different types of its design.
QLM Self-Erecting Crane:
The self-erecting tower cranes are fully automated and can position themselves and can ascend and descend as required autonomously. This autonomous capability is mainly due to the advanced computer-controlled mechanisms and technological integration within the crane system.
QLL Hammerhead Crane:
A hammerhead crane is a large vertical machine built like a tall tower with a horizontal head (jib) resembling a hammer. It works like an electrically driven trolley to lift and move heavy loads around horizontally. The lifting motion is like how a hammer strikes. The trolley moves along a rail system on the jib. The job of the hammerhead crane is to lift and move heavy materials, like steel and concrete, and put them in the right places to build large structures or to serve ships in ports.
QLL Flat Top Crane:
Flat top tower cranes have a flat-topped design instead of a traditional protruding mast. They have a load-moving trolley that runs on a fixed or an optional extended rails system.
The following LQLCMTOWERCRANE specification shows how the machine will perform when built.
The maintenance of the LQL tower crane is very important. It increases the life span of the crane. Regular maintenance also improves the safety and reliability of the crane. The following tower crane maintenance tips will be helpful.
The following industries and types of projects commonly use QLcm tower cranes.
Construction of tall structures
In the construction of skyscrapers, QLcm tower cranes are the most common useage. They are ultimate workhorses for assembling massive structures, laying multiple factory-made modules, and performing complex movements with exceptional precision.
Infrastructure development
QLcm tower cranes are also indispensable in platforms. They will strengthen this already burgeoning market as the global need for every nook and cranny of the land to be connected by seamless every inch of the terrain demands construction firms to leave no stone unturned.
QLcm tower cranes are great for making bridges, tunnels, dams, and other infrastructural entities that will stand the test of time.
Heavy industry and manufacturing
QLCm tower cranes are commonly used in the installation of large-scale production lines, such as those for solar energy, semiconductors, and automobiles, as well as the assembly of industrial facilities and manufacturing equipment. They are essential through the entire process, including securing structural components, reactors, boilers, and generators inside of factories, and even assembling floating structures like flattops and oil rigs out at sea.
Energy sector
In the energy production industry, especially the renewable energy sub-sector, QLcm tower cranes are decisive, fundamental pieces of machinery behind the increasing construction of wind farms (which include offshore wind farms) and solar power plants.
Residential and commercial projects
Large-scale installation projects like the ones mentioned above require a great deal of planning to ensure that the following things are all not only taken care of, but done in a safe and secure manner: the vital logistics of how components need to be transported, the assembly techniques required, the safety precautions undertaken, and last but not least, the qualifications and know-how of the individuals involved in the process. Only large QL tower cranes—and not any small ones—could have been used for this feat of brain, muscle, and infrastructure.
When choosing a tower crane for a construction project, there are several factors for buyers to consider to ensure the crane will meet the project's needs. They may find the following helpful in making the right decision.
By considering these factors when choosing their tower crane, buyers will be selecting a crane that is well suited to demanding their project needs.
Q1: What types of cranes are tower cranes?
A1: Three main types of tower cranes exist: the QLMC factoty top-slewing tower crane, the bottom-slewing crane, and the antenna-based self-climbing crane. They are common in the construction and building industry, commonly used for large-scale projects like skyscrapers and other massive infrastructural developments.
Q2: What is the role of a tower crane in construction?
A2: The primary function of a tower crane is to transport heavy components to various locations on a construction site. Typically, it has the capacity to move items weighing up to several tons—some over ten tons—and can lift them to heights of 50 meters or more. A tower crane can only lift materials weighing up to a certain limit. This limit is referred to as the crane's maximum load capacity.
Q3: How does a tower crane work and move materials?
A3: A tower crane has various parts like a mast, a horizontal jib, a counterweight, a lifting system, and a climb mechanism that work together to move materials around the construction site. The crane is anchored to a concrete base (the ground or a building) and secured with large horizontal steel beams called jib. The vertical mast and horizontal jib of the crane act like a giant cross, with the load attached to one end of the jib hanging down like a pendulum. When the motor on the vertical mast spins, the horizontal jib moves in the opposite direction, taking the load with it. To lift or lower materials, the motor on the trolley moves in and out along the horizontal jib, while a hook attached to a chain or cable lifts or lowers the load. A counterweight is also attached to the opposite end of the horizontal jib, and it helps to balance the weight of heavy loads as they are moved around the construction site.
Q4: What are the advantages of using tower cranes?
A4: Tower cranes are practical and essential for lifting heavy materials within the construction framework. Their advantages include the following: