4 Way Power Divider Design
About 4 way power divider design
Where to Find 4 Way Power Divider Design Suppliers?
China remains a central hub for RF component manufacturing, with key production clusters in Shenzhen, Nanjing, and Chengdu offering specialized capabilities in coaxial and cavity-based power divider designs. Shenzhen dominates high-frequency and custom RF module production, hosting over 70% of suppliers capable of supporting broadband applications from 698 MHz to 18 GHz. Nanjing and Ningbo focus on cost-effective OEM solutions, leveraging mature supply chains for N-type and SMA connectors, reducing material lead times by 20–30% compared to non-specialized regions.
These industrial zones support vertically integrated operations—from PCB etching and micro-strip fabrication to precision CNC machining—enabling rapid prototyping and scalable batch production. Suppliers in these areas typically maintain in-house design teams and anechoic chamber testing facilities, ensuring compliance with critical RF performance metrics such as insertion loss (<0.5 dB), isolation (>20 dB), and PIM levels (<-150 dBc). Buyers benefit from localized ecosystems where raw materials, plating services, and packaging suppliers are within 30 km, facilitating average lead times of 15–25 days for standard orders and 30–45 days for customized wideband models.
How to Choose 4 Way Power Divider Design Suppliers?
Selecting reliable partners requires systematic evaluation across technical, operational, and transactional dimensions:
Design and Engineering Capability
Verify supplier capacity for both micro-strip and cavity-based topologies. Leading manufacturers offer bandwidths up to 2–18 GHz and power handling from 30W to 200W, with low-PIM configurations suitable for DAS and 5G infrastructure. Confirm access to simulation tools (e.g., HFSS or CST) and request S-parameter test reports for impedance matching (VSWR ≤1.5:1).
Production Infrastructure Assessment
Evaluate the following benchmarks:
- In-house machining or assembly lines for RF shielding and connector integration
- Dedicated R&D personnel focused on passive RF components
- Surface treatment processes (gold-plated contacts, anodized housings) for environmental durability
Cross-reference response time (target ≤4 hours) and on-time delivery rates (≥99%) as indicators of operational efficiency.
Quality and Compliance Verification
Prioritize suppliers with ISO 9001 certification and RoHS compliance documentation. For telecom deployments, confirm adherence to GR-3108 or Telcordia standards. Request sample units for third-party network analyzer validation before scaling procurement. Escrow payment terms and platform-backed transaction safeguards reduce financial exposure during initial engagements.
What Are the Best 4 Way Power Divider Design Suppliers?
| Company Name | Location | Main Products | Customization Options | On-Time Delivery | Avg. Response | Online Revenue | Reorder Rate | Min. Order Quantity |
|---|---|---|---|---|---|---|---|---|
| Nanjing Huamai Technology Co., Ltd. | Jiangsu, CN | Fiber Optic Equipment, RF Modules, Telecom Parts | Not specified | 100% | ≤3h | Not disclosed | Not available | 10 pieces |
| Ningbo Jin Gang Electronics Co., Ltd. | Zhejiang, CN | RF Shields, Antennas, Passive Splitters | Not specified | 100% | ≤3h | Not disclosed | Not available | 1 piece |
| Foshan Lintratek Technology Co., Ltd. | Guangdong, CN | Repeaters, Coaxial Connectors, Splitters | Not specified | 99% | ≤4h | US $130,000+ | 26% | 1 piece |
| Shenzhen Zd Tech Co., Ltd. | Guangdong, CN | Custom RF Dividers, High-Power Labels | Color, material, size, logo, packaging, high-power label, graphic | 100% | ≤5h | US $1,900,000+ | 46% | 2 pieces |
| Chengdu Shinehigher Technology Co., Ltd. | Sichuan, CN | Custom RF Coaxial & Waveguide Splitters | Full factory customization (frequency, power, configuration) | 100% | ≤4h | US $9,000+ | 50% | 1 piece |
Performance Analysis
Shenzhen Zd Tech stands out with extensive customization options and the highest reported online revenue, indicating strong market penetration and repeat business (46% reorder rate). Chengdu Shinehigher excels in high-frequency engineered solutions, offering waveguide and coaxial variants for military and aerospace applications, supported by full prototyping flexibility. Nanjing Huamai and Ningbo Jin Gang provide entry-level pricing ($5.90–$8.90 range) ideal for budget-conscious buyers, though with limited customization visibility. Foshan Lintratek balances affordability and reliability, with competitive pricing starting at $3.00 and proven delivery consistency (99%). Suppliers with sub-10-piece MOQs enable low-volume testing, while those with in-house machining offer faster turnaround for bespoke impedance or flange requirements.
FAQs
How to verify 4 way power divider supplier reliability?
Cross-check ISO 9001 or IATF certifications where applicable. Request recent test reports for return loss, phase balance, and power handling. Analyze customer feedback focusing on real-world PIM performance and long-term thermal stability under continuous load.
What is the typical sampling timeline for custom 4 way power dividers?
Standard models ship within 7–10 days. Custom designs with specific frequency bands or connector types require 15–25 days for prototype development. Add 5–7 days for international express delivery.
Can suppliers handle global shipping and export documentation?
Yes, established manufacturers manage export logistics, including commercial invoices, packing lists, and customs declarations. Confirm Incoterms (FOB, CIF) early and ensure compliance with destination RF equipment regulations (e.g., FCC Part 15, CE RED).
Do 4 way power divider suppliers offer free samples?
Free samples are uncommon for high-frequency or high-power units. Most suppliers charge 50–100% of unit cost, refundable upon order placement above a threshold (typically 50–100 units).
How to initiate a custom 4 way power divider design request?
Provide detailed specifications: operating frequency range, input power (CW/peak), connector type (N, SMA, 7/16), VSWR requirement, and environmental rating (IP, temperature). Top-tier suppliers respond with design proposals and simulated performance curves within 72 hours.









