6 Hour On 18 Hour Off Timer Module
About 6 hour on 18 hour off timer module
Where to Find 6 Hour On 18 Hour Off Timer Module Suppliers?
China remains the central hub for electronic timer module manufacturing, with key production clusters in Zhejiang and Guangdong provinces. Ningbo in Zhejiang specializes in plug-in and wall-mounted timing solutions, leveraging mature electrical component supply chains and proximity to major ports for efficient export logistics. Shenzhen in Guangdong hosts high-density electronics ecosystems focused on digital relay modules and programmable IC-based timers, benefiting from integrated semiconductor sourcing and rapid prototyping capabilities.
These regions support vertically aligned production networks where PCB assembly, molding, and final testing occur within tightly coordinated zones. This integration enables competitive pricing and scalable output—typical lead times range from 15–25 days for standard orders, with some suppliers offering expedited fulfillment within 7–10 days for low-volume batches. Buyers gain access to diverse product variants, including AC/DC voltage compatibility (12V, 24V, 110V, 220V), LED/LCD displays, mechanical dial controls, and USB-integrated outlets, all produced under consistent quality oversight.
How to Choose 6 Hour On 18 Hour Off Timer Module Suppliers?
Procurement decisions should be guided by structured evaluation criteria:
Technical Specifications & Compliance
Verify that products meet international safety standards such as CE, RoHS, and REACH, particularly for end markets in Europe and North America. Confirm input/output voltage ranges, load capacity (resistive vs. inductive), and cycle accuracy (±1% tolerance recommended). Request test reports for long-duration operation stability over multiple on/off cycles.
Production and Customization Capability
Assess supplier infrastructure through available indicators:
- Minimum monthly output capacity exceeding 10,000 units
- In-house design and programming capability for custom timing sequences
- Support for OEM/ODM services, including branding, packaging, and interface modifications
Cross-reference listed product variety with specialization tags—suppliers emphasizing ICs, relays, or power modules typically offer higher technical reliability.
Transaction Reliability Metrics
Prioritize suppliers demonstrating verified performance: on-time delivery rates ≥98%, response times ≤6 hours, and reorder rates indicating customer retention. Use transaction histories to assess consistency in order fulfillment and post-sale communication. For initial procurement, conduct sample testing to validate timing precision, build quality, and thermal performance under continuous use.
What Are the Best 6 Hour On 18 Hour Off Timer Module Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order (Units) | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Ningbo Topeast Electronic Technology Co., Ltd. | Ningbo, CN | Soldering Irons, Connectors, Flow Switches | US $10,000+ | 100% | ≤3h | <15% | 10–1,000 | $1.00–$5.00 |
| Shenzhen Gihe Electronics Co., Ltd. | Shenzhen, CN | ICs, Microcontrollers, Power Relays | US $3,000+ | 100% | ≤7h | <15% | 10–50 | $1.80–$8.50 |
| Siqi Technology Co., Ltd. | Guangdong, CN | Circuit Breakers, Relays, ATS | US $60,000+ | 100% | ≤3h | 29% | 5–100 | $5.50–$10.00 |
| Ningbo Timebest Electrical Technology Co., Ltd. | Ningbo, CN | Time Switches, Plugs & Sockets | US $20,000+ | 100% | ≤6h | <15% | 5–500 | $2.90–$3.50 |
| Shenzhen Si Hai Xin Zhou Technology Co., Ltd. | Shenzhen, CN | Electronic Modules, ICs, PCBA | US $120,000+ | 100% | ≤2h | <15% | 5–10 | $0.94–$2.54 |
Performance Analysis
Suppliers like Shenzhen Si Hai Xin Zhou Technology offer aggressive pricing ($0.94/unit) and ultra-fast response times (≤2h), making them ideal for small-batch trials and urgent procurement. Siqi Technology stands out with a 29% reorder rate—indicating strong end-user satisfaction—despite higher price points, suggesting superior durability or technical support. Ningbo-based firms provide mid-range pricing with flexible MOQs, suitable for retail and distribution channels requiring mixed-order scalability. Shenzhen Gihe and Si Hai Xin Zhou demonstrate deep expertise in semiconductor-driven modules, enabling precise digital timing control essential for industrial automation applications.
FAQs
How to verify timer module supplier reliability?
Cross-check compliance claims with documented certifications. Request sample units to evaluate construction quality, timing accuracy, and labeling clarity. Analyze supplier responsiveness and technical detail in replies to engineering inquiries as proxies for after-sales support capability.
What is the typical minimum order quantity?
MOQs vary significantly: from 5–10 pieces for high-end digital models to 1,000 units for basic mechanical versions. Many suppliers reduce per-unit costs substantially at volumes above 500 pieces, enabling cost optimization for bulk buyers.
Can suppliers customize timing cycles or physical design?
Yes, most suppliers support ODM/OEM modifications including custom on/off durations, voltage ratings, housing colors, and branding. Digital modules based on NE555 or microcontroller platforms allow reprogramming for non-standard sequences beyond the default 6h on / 18h off cycle.
What are common lead times for production and shipping?
Standard production lead time is 15–20 days after deposit confirmation. Air freight adds 5–7 days for international delivery; sea freight requires 25–35 days but reduces transportation costs by up to 60% for container loads.
Do suppliers provide technical documentation?
Leading suppliers supply datasheets covering electrical specifications, wiring diagrams, and environmental operating ranges (-10°C to +55°C typical). For integration into larger systems, confirm availability of CAD drawings or 3D models upon request.









