Amazon Counter Top Ice Maker
CN
About amazon counter top ice maker
Where to Find Counter Top Ice Maker Suppliers?
China remains the central hub for countertop ice maker manufacturing, with key production clusters concentrated in Guangdong and Zhejiang provinces. These regions host vertically integrated supply chains encompassing compressor fabrication, mold development, injection molding, and final assembly—enabling rapid prototyping and scalable output. Guangdong, particularly Foshan and Shunde, accounts for over 70% of small-scale commercial and residential ice maker production, supported by mature ecosystems of component suppliers and logistics networks that streamline export operations.
The industrial infrastructure allows manufacturers to maintain low production costs while supporting high-volume orders and customization demands. Average factory lead times range from 25–40 days for standard models, with some suppliers offering expedited fulfillment within 15 days for repeat orders. Localized access to motors, evaporators, food-grade plastics, and control systems reduces material procurement cycles by up to 30%. Buyers benefit from flexible MOQs, ranging from 1 to 200 units, depending on model complexity and supplier capacity.
How to Choose Counter Top Ice Maker Suppliers?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional dimensions:
Technical & Design Capabilities
Prioritize suppliers with demonstrated expertise in compact refrigeration systems and user-centric design features such as APP-controlled operation, self-cleaning functions, and energy-efficient compressors. Confirm availability of multiple ice types (cubed, nugget, bullet) and tank capacities (6–26 lbs). Evaluate engineering support for custom modifications including voltage (110V/220V), plug types, panel interfaces, and branding elements.
Production & Quality Verification
Assess core manufacturing indicators:
- In-house tooling and mold-making capabilities for faster iteration
- Integration of automated testing stations for leak detection, cooling performance, and cycle durability
- Compliance with international safety and environmental standards (CE, RoHS, ETL, UL)—request verifiable test reports
- On-time delivery rates exceeding 95%, with response times under 10 hours indicating operational responsiveness
Certifications like ISO 9001 are strong proxies for consistent quality management, though not universally held among mid-tier exporters.
Customization and Transaction Security
Most leading suppliers offer OEM/ODM services covering color, logo, packaging, material substitution, and UI labeling. Verify customization scope through sample validation before mass production. Utilize secure payment mechanisms such as trade assurance or escrow services. Request product samples to assess build quality, noise levels, freezing speed, and condensation control—critical factors influencing end-user satisfaction on retail platforms.
What Are the Best Counter Top Ice Maker Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Min. Order Quantity |
|---|---|---|---|---|---|---|---|
| Foshan Keku Electrical Appliance Co., Ltd. | Ice Makers, Ice Cream Machines, Drink Dispensers | US $510,000+ | 58% | ≤10h | 29% | Color, size, logo, packaging, label, graphic, motor | Varies by model |
| Xiangxiangniu Network Technology (Guangdong) Co., Ltd. | Smart Range Hoods, Ice Makers, Robot Vacuums | US $4,000+ | 100% | ≤3h | <15% | Limited (inferred) | 2–30 pieces |
| Guangdong Invitop Technology Co., Ltd. | Professional Crystal Ice Makers, Nugget Ice Machines | US $210,000+ | - | ≤9h | - | Color, material, size, logo, packaging, plug, label, graphic | 100 pieces |
| Biso Intelligent Technology (Ningbo) Co., Ltd. | Countertop Ice Makers, Ice Crushers, Cube Makers | US $1,000+ | 100% | ≤9h | - | Color, material, size, logo, plug, label, panel | 2–200 pieces |
| Yuhe Group Co., Ltd. | Electric Ice Makers, Self-Cleaning Models, Commercial Units | - | - | ≤3h | - | Not specified | 1 piece |
Performance Analysis
Xiangxiangniu and Biso stand out for perfect on-time delivery records, with Xiangxiangniu offering the fastest average response time (≤3h), a critical advantage for agile sourcing cycles. Yuhe Group provides the lowest MOQ (1 piece), making it suitable for sampling and niche market testing. Foshan Keku demonstrates substantial revenue volume and broad customization capacity, though its 58% on-time delivery rate suggests potential fulfillment risks under peak demand. Guangdong Invitop offers comprehensive OEM flexibility but requires minimum batches of 100 units, aligning better with established brands than startups. Suppliers based in Guangdong dominate feature innovation, particularly in smart connectivity and compact design, while Ningbo-based Biso emphasizes robust mechanical builds for commercial use.
FAQs
How to verify countertop ice maker supplier reliability?
Cross-check declared certifications (CE, RoHS, ETL) with official databases or third-party inspection agencies like SGS or TÜV. Request factory audit reports or video tours to validate production lines and quality checkpoints. Analyze transaction history, focusing on consistent order fulfillment and customer service responsiveness.
What is the typical sampling timeline?
Standard sample production takes 7–15 days, depending on customization level. Smart models with APP integration may require 20–25 days due to firmware configuration. Air shipping adds 5–10 days for international delivery. Some suppliers offer free samples for future bulk commitments.
Can suppliers accommodate global voltage and plug standards?
Yes, many manufacturers support dual-voltage designs (110V/220V) and can integrate regional plug types (US, EU, UK, AU). Confirm compatibility during technical specification review and request electrical schematics for compliance verification.
Do suppliers provide after-sales technical support?
Support varies. Larger manufacturers typically offer basic troubleshooting documentation and spare parts supply. For advanced assistance, negotiate dedicated support agreements upfront, especially for firmware updates or field failure analysis.
How to optimize MOQ and pricing negotiations?
Leverage competitive quotes from multiple suppliers to benchmark pricing. Consolidate SKUs to increase order volume and reduce per-unit cost. Consider hybrid strategies: use low-MOQ suppliers for initial market entry and transition to high-volume partners once demand stabilizes.









