Button Box
About button box
Where to Find Button Box Suppliers?
China remains the central hub for industrial button box manufacturing, with key production clusters in Zhejiang, Shanghai, and Guangdong provinces. Yueqing in Zhejiang province hosts a dense network of electrical component manufacturers, specializing in control enclosures and push-button systems. This region benefits from vertically integrated supply chains—ranging from cold-rolled steel and die-cast aluminum processing to injection molding of polycarbonate (PC) shells—enabling rapid prototyping and scalable production. Shanghai-based suppliers leverage proximity to R&D centers and international logistics gateways, facilitating faster export cycles and advanced customization capabilities.
These industrial ecosystems support cost efficiencies of 20–35% compared to Western counterparts due to localized material sourcing and automated assembly lines. Suppliers typically operate facilities equipped with CNC stamping, powder coating, silk-screen labeling, and waterproof sealing technologies. Average lead times range from 15 to 30 days for standard orders, with express production options available for urgent procurement. The concentration of technical talent and component vendors within 50km radii ensures agility in fulfilling both bulk shipments and engineered-to-order solutions.
How to Choose Button Box Suppliers?
Procurement decisions should be guided by rigorous evaluation criteria focused on technical capability, quality assurance, and transaction reliability.
Technical & Material Specifications
Verify supplier expertise in required materials: cold-rolled steel, cast aluminum, or polycarbonate housings. Industrial-grade button boxes must meet IP65 or higher ingress protection ratings for dust and moisture resistance. For hazardous environments, confirm availability of explosion-proof models compliant with ATEX or IECEx standards. Evaluate design flexibility—including flange configurations, cable entry points, push-button layouts (1-way to 5-way), and custom silk-screened labels.
Quality Management Systems
Prioritize suppliers with documented adherence to ISO 9001 quality management principles. While not always explicitly stated, consistent on-time delivery rates above 94% and low reorder rates (<20%) indicate stable production processes. Request evidence of environmental testing (e.g., low-temperature operation, UV resistance) and mechanical durability validation (e.g., push-button cycle testing).
Production Capacity and Responsiveness
Assess operational scale through key indicators:
- On-time delivery performance exceeding 95%
- Average response time under 4 hours (top-tier suppliers respond in ≤1 hour)
- Customization support including CAD drawings, logo printing, color coding, and socket integration
- Demonstrated experience with international exports and multilingual technical documentation
Cross-reference product listings with actual manufacturing output capacity. High online revenue (>$70,000 annually via digital channels) often correlates with established export infrastructure and inventory readiness.
Transaction Security and Sampling
Utilize secure payment mechanisms such as escrow services to mitigate risk. Require physical or digital samples before large-scale orders—expect sampling lead times of 7–14 days. Evaluate build quality, labeling accuracy, and packaging integrity upon receipt. Minimum order quantities (MOQs) vary widely, from 1 set for specialized explosion-proof units to 5–10 pieces for standard configurations, providing flexibility for pilot runs.
What Are the Best Button Box Suppliers?
| Company Name | Main Products (Listings) | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Support | Key Materials | Specializations |
|---|---|---|---|---|---|---|---|---|
| Shanghai Saipwell Electric Co., Ltd. | Electronics & Instrument Enclosures, Power Distribution Equipment | US $140,000+ | 100% | ≤3h | 26% | Yes | ABS, Cold-Rolled Steel | Waterproof, Custom Logo, Multi-Way Configurations |
| Shanghai Gb Machinery & Electric Co., Ltd. | Electronics & Instrument Enclosures (281), Push Button Switches | US $70,000+ | 93% | ≤1h | 15% | Limited | Cast Aluminum, Plastic | Handheld Units, Industrial Waterproof Boxes |
| Zhongshan Longju Technology Co., Ltd. | Explosion-Proof Enclosures, Control Boxes | US $40,000+ | 96% | ≤1h | 20% | Yes | PC Material, Die-Cast Carbon Steel | ATEX/IECEx Flameproof, Hazardous Area Applications |
| Yueqing Saip Electric Co., Ltd. | Electronics & Instrument Enclosures (879), Plugs & Sockets | US $20,000+ | 94% | ≤4h | <15% | Yes | Cold-Rolled Steel, Rubber Seals | Industrial Socket Integration, Outdoor Use Models |
Performance Analysis
Shanghai Saipwell leads in reliability with a 100% on-time delivery rate and robust customization capabilities, making it ideal for high-volume or technically complex projects. Zhongshan Longju stands out in safety-critical sectors, offering certified explosion-proof designs suitable for oil & gas, mining, and chemical processing applications. Shanghai Gb Machinery offers broad product diversity and fast responsiveness, though lower reorder rates suggest potential gaps in long-term customer satisfaction. Yueqing Saip Electric provides high listing volume but lags in reorder metrics, indicating possible challenges in post-sale service or consistency.
FAQs
How to verify button box supplier reliability?
Validate claims through third-party transaction records, on-site audit reports (or virtual factory tours), and independent customer references. Confirm compliance with applicable safety and environmental standards (e.g., CE marking, RoHS). Analyze response patterns and order fulfillment history for signs of operational stability.
What is the typical MOQ and pricing range?
MOQs generally start at 1–5 pieces, depending on complexity. Prices range from $0.48 for basic plastic units to over $100 for handheld or explosion-proof models. Bulk discounts are commonly offered beyond 100 units.
Can suppliers provide CAD drawings and technical documentation?
Yes, leading suppliers offer dimensioned CAD files, circuit diagrams, and installation manuals—especially for customized enclosures. Turnaround time for drawings is typically 24–72 hours after specification confirmation.
Are explosion-proof button boxes available with certifications?
Select suppliers provide ATEX, IECEx, or national flameproof certifications. Ensure model-specific certification documentation is provided prior to purchase, particularly for deployment in classified hazardous zones.
How long does customization take?
Customization lead time averages 10–20 days, depending on design complexity and approval cycles. Add 5–10 days for mold creation if non-standard housing shapes are required.









