Ccs2 To Ccs1 Adapter Producer
About ccs2 to ccs1 adapter producer
Where to Find CCS2 to CCS1 Adapter Producers?
China remains the central hub for EV charging infrastructure components, including CCS2 to CCS1 adapter manufacturing. Key production clusters are concentrated in Guangdong, Zhejiang, and Jiangsu provinces—regions known for advanced electronics and connector assembly ecosystems. Guangdong, particularly around Shenzhen, hosts a dense network of precision electronics manufacturers with access to high-grade copper, aluminum, and engineering plastics used in conductive and insulated housing components.
These industrial zones support vertically integrated production, combining stamping, molding, plating, and final assembly under one roof. This integration enables rapid prototyping and scalable output, with some facilities capable of producing 50,000–100,000 units per month. Proximity to Tier-1 EV charger OEMs allows producers to align with evolving interface standards and maintain tight tolerances required for high-voltage DC compatibility. Buyers benefit from shorter development cycles, localized supply chains reducing material lead times by 20–30%, and established export logistics channels serving North American and European markets.
How to Choose CCS2 to CCS1 Adapter Suppliers?
Selecting reliable suppliers requires rigorous evaluation across technical, operational, and compliance dimensions:
Quality & Safety Certification
Ensure adherence to IEC 62196-2 and UL 2251 standards for electric vehicle couplers. CE, RoHS, and FCC certifications are mandatory for market entry in Europe and North America. Request test reports on contact resistance (<0.5 mΩ), insulation voltage (up to 1,000 V DC), and thermal performance under continuous 200A load conditions.
Production Infrastructure Assessment
Evaluate core capabilities through documented evidence:
- Minimum 2,000m² production area with ESD-protected assembly zones
- In-house tooling and injection molding for housing components
- Automated crimping and welding stations for terminal connections
Confirm monthly capacity exceeding 30,000 units and validate yield rates above 98% through process audits.
Procurement & Transaction Security
Utilize secure payment mechanisms such as letter of credit or escrow services until product verification is complete. Prioritize suppliers offering pre-shipment inspection rights and third-party lab testing (e.g., TÜV, SGS). Sample validation should include mating cycle endurance (minimum 10,000 insertions) and IP54 environmental sealing tests.
What Are the Best CCS2 to CCS1 Adapter Suppliers?
| Company Name | Location | Years Operating | Staff | Factory Area | On-Time Delivery | Avg. Response | Ratings | Reorder Rate |
|---|---|---|---|---|---|---|---|---|
| No qualified suppliers listed | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Performance Analysis
The available dataset does not list verified CCS2 to CCS1 adapter producers meeting minimum operational thresholds. In absence of direct supplier data, buyers should focus on firms specializing in EV charging connectors with documented experience in adapting IEC-compliant designs for cross-regional compatibility. Emphasis should be placed on engineering transparency—request CAD models, material datasheets, and certification trails. Engage potential suppliers through factory audits or virtual walkthroughs to verify automation levels and quality control checkpoints before order placement.
FAQs
How to verify CCS2 to CCS1 adapter supplier reliability?
Cross-validate certifications with accredited bodies and request full traceability documentation for raw materials. Conduct on-site or remote audits to assess production line controls, especially for contact alignment and over-molding integrity. Review customer references for field failure rates and after-sales responsiveness.
What is the typical sampling timeline?
Standard adapter samples take 7–14 days to produce, depending on mold availability. Custom configurations with branding or extended cable lengths may require up to 21 days. Air shipping adds 5–7 days for international delivery.
Can suppliers ship CCS2 to CCS1 adapters worldwide?
Yes, most manufacturers offer global shipping via express courier or sea freight. Confirm Incoterms (FOB, CIF, DDP) and ensure packaging meets ISTA 3A standards for electrostatic-sensitive devices during transit.
Do manufacturers provide free samples?
Sample policies vary by order volume. Many suppliers waive fees for qualified buyers committing to MOQs of 1,000+ units. For trial orders, expect to cover 50–70% of unit cost plus freight, which may be credited upon bulk purchase.
How to initiate customization requests?
Submit detailed specifications including cable length (3–7.5m standard), connector shell material (PC+ABS or nylon), current rating (125A–200A), and branding requirements. Reputable producers will return engineering drawings and compliance declarations within 5 business days.









