Ch341a Programmer
CN
About ch341a programmer
Where to Find CH341A Programmer Suppliers?
China remains the central hub for CH341A programmer manufacturing, with Shenzhen-based suppliers dominating production due to concentrated electronics ecosystems in Guangdong Province. These clusters offer integrated access to PCB fabrication, IC sourcing, and surface-mount technology (SMT) assembly lines, enabling rapid prototyping and scalable output. Over 80% of listed suppliers operate within a 50km radius of Shenzhen’s Huaqiangbei electronics market, leveraging just-in-time component availability and reducing material lead times by up to 40% compared to non-specialized regions.
The industrial advantage extends to vertical integration—many manufacturers maintain in-house design, testing, and packaging capabilities, supporting MOQs as low as one unit while fulfilling bulk orders exceeding 10,000 pieces monthly. This infrastructure allows for cost efficiency, with average unit prices ranging from $1.20 to $2.79 for standard modules. Buyers benefit from short production cycles (typically 3–7 days post-payment) and compatibility with global logistics networks, facilitating direct shipping to North America, Europe, and Southeast Asia.
How to Choose CH341A Programmer Suppliers?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Specifications & Compliance
Verify that devices comply with USB 2.0 full-speed interface standards and support common EEPROM families (24-series, 25-series). Confirm firmware compatibility with widely used software such as XGecu TL866 or CH341A utility tools. While formal certifications like CE or RoHS are not universally declared, prioritize suppliers referencing compliance with environmental and safety directives in product descriptions or upon request.
Production and Operational Capacity
Assess operational scale through key indicators:
- Monthly online revenue exceeding US $60,000 as an indicator of market presence
- On-time delivery rates ≥95%, with top performers achieving 100%
- Average response time ≤3 hours, signaling responsive customer support
- Diverse product portfolios indicating technical versatility (e.g., ICs, development boards, electronic modules)
Cross-reference these metrics with available customization options—some suppliers offer hardware modifications or bundling with adapters and sockets.
Procurement Safeguards
Utilize secure payment methods where available, particularly for initial transactions. Request sample units to evaluate build quality, pin alignment, and functional reliability before scaling orders. Validate seller claims through order history analysis and buyer feedback where accessible. Ensure return policies and dispute resolution mechanisms are clearly defined prior to purchase.
What Are the Best CH341A Programmer Suppliers?
| Company Name | Location | Online Revenue | Main Product Lines | On-Time Delivery | Avg. Response | Reorder Rate | Min. Price (USD) | MOQ Flexibility |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Yuzens Technologies Co. Ltd. | Shenzhen, CN | US $60,000+ | ICs, Electronic Modules, Power Supplies | 100% | ≤3h | <15% | $1.20 | 1 piece |
| Shenzhen Tuozhanteng Electronic Components Co., Ltd. | Shenzhen, CN | US $110,000+ | ICs, Sensors, OLED Modules | 95% | ≤6h | <15% | $1.30 | 5 pieces |
| Shenzhen Futian District Jiaxinda Technology Electronic Trade Department | Shenzhen, CN | US $60,000+ | ICs, Custom Solutions | 100% | ≤2h | 15% | $1.90 | 1 piece |
| Shenzhen Jingmaoyuan Electronics Co., Ltd. | Shenzhen, CN | US $100,000+ | ICs, Development Boards, Transistors | 100% | ≤2h | <15% | $1.24 | 1 piece |
| Shenzhen Goldtech Electronics Co., Limited | Shenzhen, CN | US $550,000+ | ICs, Amplifiers, Microcontrollers | 95% | ≤5h | <15% | $1.50 | 1 piece |
Performance Analysis
Shenzhen Goldtech Electronics leads in sales volume, indicating strong market penetration and distribution capability, while maintaining competitive pricing and high on-time fulfillment. Multiple suppliers achieve perfect on-time delivery records (100%), with Jingmaoyuan and Yuzens demonstrating superior responsiveness (≤3h). All top-tier suppliers offer MOQs of 1–5 pieces, enabling low-risk sampling and small-scale integration testing. Reorder rates remain below 15% across most entities, suggesting a transactional buyer profile rather than long-term contractual relationships—highlighting the importance of consistent quality validation. Buyers seeking customization should engage suppliers explicitly listing specification flexibility, such as Shenzhen Jiaxinda.
FAQs
How to verify CH341A programmer supplier reliability?
Evaluate reliability through documented on-time delivery performance (target ≥95%), response speed (ideally ≤3 hours), and revenue benchmarks (preferably over US $60,000 annually). Request functional samples to assess soldering quality, connector durability, and chip marking authenticity. Confirm firmware update support and software compatibility prior to mass procurement.
What is the typical sampling timeline?
Sample processing typically takes 1–3 business days after payment confirmation. Shipping via standard international mail adds 7–14 days depending on destination. Expedited handling and express courier options may reduce total delivery time to under one week.
Can suppliers ship CH341A programmers worldwide?
Yes, all listed suppliers support international shipping. Most offer multiple dispatch methods, including ePacket, DHL, and FedEx. Confirm incoterms (e.g., EXW, FOB) during negotiation to clarify responsibility for customs clearance and import duties.
Do suppliers provide free samples?
Free samples are uncommon; however, some vendors offer low-cost trial units (priced at $1.20–$2.60) with no minimum order. Sample fees may be credited toward future bulk purchases, subject to individual supplier policy.
How to initiate customization requests?
Submit detailed requirements including desired pinout configurations, cable length, housing type, or bundled accessories (e.g., SOP8 clips, adapter boards). Suppliers with documented customization capabilities will respond with feasibility assessments and revised quotations within 24–48 hours.









