Computer Case Desk Producer
About computer case desk producer
Where to Find Computer Case Desk Producer Suppliers?
China remains the central hub for computer case and desk manufacturing, with key production clusters concentrated in Guangdong province—particularly Dongguan and Guangzhou. These regions host vertically integrated facilities specializing in sheet metal fabrication, CNC machining, and assembly of PC enclosures and ergonomic workstation solutions. The industrial ecosystem supports rapid prototyping and high-volume output, leveraging localized access to cold-rolled steel, tempered glass, aluminum alloys, and injection-molded plastics.
Manufacturers in this region benefit from mature supply chains for structural components, cooling systems, and cable management modules, enabling cost efficiencies of 20–35% compared to non-Asian producers. Average lead times for standard orders range from 15 to 30 days, with expedited production available for pre-stocked models. Buyers gain access to flexible MOQ structures—from single-piece sampling to container-scale procurement—supported by responsive digital communication channels and integrated logistics networks for global export.
How to Choose Computer Case Desk Producer Suppliers?
Effective supplier selection requires structured evaluation across technical, operational, and transactional dimensions:
Production & Customization Capability
Prioritize suppliers offering OEM/ODM services with documented experience in material finishing (e.g., powder coating, anodizing), laser branding, and modular design adaptation. Confirm capacity for custom panel layout, I/O configuration, RGB lighting integration, and multi-bay support (ATX, Micro-ATX, Mini-ITX). Key indicators include dedicated R&D teams and in-house tooling for mold development.
Quality Assurance Protocols
While formal certifications (ISO 9001, CE, RoHS) are not explicitly stated in available data, assess compliance indirectly through on-time delivery performance and response consistency. Target suppliers with verified track records of ≥95% on-time shipment and sub-3-hour average response times. Request product test reports for EMI shielding, structural durability, and thermal ventilation efficiency where applicable.
Transaction Reliability Indicators
Evaluate online revenue transparency and reorder rate metrics as proxies for market acceptance. Favor suppliers with established digital storefronts showing consistent transaction volume (e.g., >US $100,000 annual online revenue). Utilize secure payment frameworks and require sample validation before bulk ordering. Conduct virtual audits via factory video tours to verify equipment and workflow organization.
What Are the Best Computer Case Desk Producer Suppliers?
| Company Name | Main Products | Customization Options | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Dongguan Qifeng Electronic Technology Co., Ltd. | Fans & Cooling, Computer Cases & Towers, PC Power Supplies | Color, material, size, logo, packaging, label, graphic, catalogue | US $1,200,000+ | 89% | ≤3h | 21% | Not specified | Not specified |
| Guangzhou Hurricane Beast Import And Export Co., Ltd. | Computer Cases & Towers, Fans & Cooling, Keyboards, Mice | OEM/Custom designs supported | US $2,000+ | 100% | ≤1h | <15% | 1–5 pieces | $9.88–129.81 |
| Xingyusheng (Guangzhou) Electronics Co., Ltd. | Computer Cases & Towers, Fans & Cooling, PC Power Supplies | OEM/Tempered glass options | US $30,000+ | 50% | ≤2h | <15% | 1–10 pieces | $10.90–39.00 |
| Chongqing Coolmoon Electronic Co., Ltd. | Gaming Computer Cases, Fans & Cooling, Laptop Cases | Wholesale customization, OEM support | US $40,000+ | 100% | ≤1h | 16% | 200–500 pieces | $17.99–41.90 |
| Guangzhou Manmu Technology Co., Ltd. | Computer Cases & Towers, Fans & Cooling, PC Power Supplies | Aluminum alloy, micro-ATX, mid-tower variants | US $150,000+ | 95% | ≤3h | 15% | 1–500 pieces | $0.93–28.50 |
Performance Analysis
Dongguan Qifeng stands out for scale, with over US $1.2 million in reported online revenue and comprehensive customization capabilities, though its 89% on-time delivery rate suggests room for logistical improvement. Guangzhou Hurricane Beast and Chongqing Coolmoon both achieve perfect 100% on-time delivery with rapid ≤1h response times, indicating strong operational discipline despite lower reorder rates. Coolmoon caters to large-volume buyers with MOQs starting at 200 units, while Hurricane Beast offers low-barrier entry with 1-piece minimums. Manmu Technology balances responsiveness and scalability, serving both sample and bulk needs efficiently. Xingyusheng lags in delivery reliability (50%), signaling potential fulfillment risks despite competitive pricing.
FAQs
How to verify computer case desk producer reliability?
Cross-reference self-reported metrics with transaction history and customer feedback where available. Request evidence of quality control processes, such as weld integrity checks, paint adhesion testing, and ESD-safe packaging. Conduct virtual factory inspections to confirm production line automation and inventory management practices.
What is the typical sampling timeline?
Standard samples are typically produced within 7–14 days. Custom-designed cases involving new molds or materials may require 20–30 days. Air shipping adds 5–10 days depending on destination.
Can suppliers accommodate small orders or prototypes?
Yes, several suppliers—including Guangzhou Hurricane Beast and Manmu Technology—support single-unit orders, making them suitable for prototyping and niche market testing. However, unit costs are higher at low volumes; economies of scale emerge at 100+ units.
Do manufacturers provide free samples?
Free samples are uncommon. Most suppliers charge full or partial fees, which may be credited toward future bulk orders. Expect to pay shipping and handling regardless.
How to initiate customization requests?
Submit detailed specifications including chassis dimensions, material type (SECC steel, aluminum, tempered glass), color finish, ventilation layout, drive bay count, and branding requirements. Reputable suppliers will respond with engineering drawings or 3D renderings within 3–5 business days for approval prior to tooling.









