Countertop Chewable Ice Maker
CN
About countertop chewable ice maker
Where to Find Countertop Chewable Ice Maker Suppliers?
China remains the central hub for countertop chewable ice maker manufacturing, with key production clusters concentrated in Zhejiang and Fujian provinces. These regions host vertically integrated supply chains that support rapid prototyping and high-volume production of compact ice-making appliances. The Ningbo and Yuyao industrial zones in Zhejiang specialize in small household appliances, offering access to precision injection molding, refrigeration module assembly, and stainless steel fabrication—all within a 30km radius. Fujian’s Xiamen region leverages its coastal logistics infrastructure to streamline export operations, reducing shipping lead times by 5–7 days compared to inland hubs.
Manufacturers in these clusters typically operate semi-automated production lines capable of producing 10,000–50,000 units monthly per facility. Common materials include food-grade ABS plastic, 304 stainless steel, and BPA-free polymer components compliant with international safety standards. Core processing techniques involve rotary evaporator condensers, thermoelectric or compressor-based cooling systems, and modular auger designs optimized for nugget or pellet ice formation. This specialization enables suppliers to maintain consistent output while supporting both OEM and ODM configurations.
How to Choose Countertop Chewable Ice Maker Suppliers?
Effective supplier selection requires structured evaluation across technical, operational, and transactional dimensions:
Quality & Compliance Verification
Confirm adherence to internationally recognized certifications such as CE, UKCA, and RoHS. For North American markets, validate ETL or UL listing eligibility through documented electrical safety testing. Review product compliance with IEC 60335-2-89 for household refrigerating appliances. Suppliers should provide test reports for insulation resistance, leakage current, and thermal overload protection.
Production Capacity Assessment
Evaluate key operational metrics:
- Minimum factory area exceeding 3,000m² to ensure stable batch processing
- In-house tooling and mold-making capabilities for faster design iteration
- Monthly production capacity above 10,000 units for scalability
Cross-reference online revenue data and on-time delivery performance (target: ≥98%) to assess fulfillment reliability.
Customization & Transaction Security
Prioritize suppliers offering customization options in color, material grade, logo imprinting, packaging, and control panel labeling. Verify availability of graphic design support for branding integration. Utilize secure transaction mechanisms such as escrow payment systems and insist on pre-shipment inspection protocols. Request sample units to evaluate build quality, noise levels (typically 40–50 dB), and ice production cycle consistency before bulk ordering.
What Are the Best Countertop Chewable Ice Maker Suppliers?
| Company Name | Location | Online Revenue | Min. Order Quantity | Avg. Unit Price (USD) | On-Time Delivery | Avg. Response Time | Reorder Rate | Customization |
|---|---|---|---|---|---|---|---|---|
| Ningbo Wing Smart Electric Appliance Co., Ltd. | Zhejiang, CN | US $1,000+ | 100–1,000 pcs | $38.80–$168.80 | 100.0% | ≤2h | <15% | Yes |
| Xiamen Beiruikang Technology Co., Ltd. | Fujian, CN | US $290,000+ | 1 pc | $43.89–$180 | 100.0% | ≤2h | <15% | No |
| Yuyao Haohong Electrical Appliance Co., Ltd. | Zhejiang, CN | US $170,000+ | 1 pc | $66.90–$200 | 100.0% | ≤2h | <15% | No |
| Yiwu Aikelansi Electrical Appliance Co., Ltd. | Zhejiang, CN | US $70,000+ | 2 pcs | $40.08–$47.95 | 100.0% | ≤5h | <15% | Yes |
| Xiamen Sunford Industry Trade Co., Ltd. | Fujian, CN | US $290,000+ | 200 pcs | $75–$101 | 100.0% | ≤5h | <15% | Yes |
Performance Analysis
Suppliers like Xiamen Beiruikang and Xiamen Sunford demonstrate strong export readiness with high online transaction volumes and flexible MOQs starting from one piece—ideal for market testing or niche distribution. Ningbo Wing Smart and Yiwu Aikelansi offer customization capabilities critical for branded retail or private-label strategies, though at higher minimum order thresholds. All five suppliers maintain perfect on-time delivery records, indicating reliable logistics execution. However, reorder rates below 15% suggest limited repeat customer volume, potentially reflecting competitive pricing over long-term relationship building. Buyers seeking cost efficiency may favor Yiwu-based manufacturers with unit prices under $48, while those requiring certification-compliant models (e.g., UKCA, CE) should engage verified suppliers with full documentation packages.
FAQs
How to verify countertop chewable ice maker supplier reliability?
Validate certifications through official databases and request third-party inspection reports from agencies like SGS or TÜV. Conduct video audits of production floors to confirm automation levels and quality control checkpoints. Analyze customer feedback focusing on after-sales service, defect rates, and warranty handling.
What is the typical sampling timeline?
Standard samples are produced within 7–14 days. Customized units with logo printing or modified enclosures require 15–21 days. Air freight delivery adds 5–10 business days globally.
Do suppliers support global shipping?
Yes, most suppliers offer FOB, CIF, and DDP terms. Confirm Incoterms alignment with your logistics provider and verify compliance with destination regulations for electrical appliances, including voltage compatibility (110V/220V) and plug types.
Are free samples available?
Free samples are rare; expect to pay 50–100% of the unit cost, which may be credited toward future orders exceeding 500 pieces. Some suppliers waive fees for qualified buyers with verifiable resale channels.
How to initiate customization projects?
Submit detailed specifications including desired ice type (nugget, pellet, crushed), daily output (12–20kg/day), tank capacity (0.8–2.2L), power requirements, and aesthetic preferences. Reputable suppliers will respond with engineering drawings, material options, and prototype timelines within 72 hours.









