Devanti 2 In 1 Ice Maker
CN
About devanti 2 in 1 ice maker
Where to Find Devanti 2 in 1 Ice Maker Suppliers?
China remains the central hub for compact refrigeration and dual-function ice-making equipment manufacturing, with key supplier clusters concentrated in Guangdong, Zhejiang, and Hebei provinces. These regions host vertically integrated production networks specializing in consumer-grade and commercial refrigeration systems, including 2-in-1 ice makers combining rapid ice production with water dispensing or soft-serve capabilities. The industrial ecosystem supports efficient sourcing of compressors, food-grade tanks, digital control panels, and customized molds, enabling competitive pricing and scalable output.
Suppliers in Ningbo and Jiangmen leverage proximity to port infrastructure and component manufacturers, reducing logistics lead times by 10–15% compared to inland facilities. Facilities typically operate automated assembly lines with monthly production capacities ranging from 1,000 to 5,000 units, depending on model complexity. Buyers benefit from localized supply chains for stainless steel housings, plastic reservoirs, and refrigerant-charged cooling modules, which contribute to a 20–30% cost advantage over equivalent European or North American production. Standard lead times range from 25 to 40 days for containerized orders, with express production options available for smaller batches.
How to Choose Devanti 2 in 1 Ice Maker Suppliers?
Procurement decisions should be guided by structured evaluation criteria focused on technical capability, compliance, and transaction reliability:
Technical and Functional Compliance
Verify adherence to international safety and performance standards, including CE, RoHS, and UL certifications where applicable. For dual-function units (e.g., ice maker + water dispenser), confirm electrical insulation ratings, refrigerant type (R134a or R600a), and material compliance with NSF/ANSI 51 for food contact surfaces. Request test reports for compressor longevity, ice yield consistency (measured in kg/24h), and energy consumption under load conditions.
Production and Customization Capacity
Assess supplier flexibility through the following indicators:
- Minimum Order Quantity (MOQ) below 100 units indicates agility for trial orders
- In-house design teams capable of modifying tank color, plug type, logo placement, and control panel graphics
- Ability to adjust ice cube size (typically 22x22mm to 33x33mm) and cycle time (6–15 minutes per batch)
Prioritize suppliers offering OEM/ODM services with documented experience in packaging redesign and bilingual labeling.
Supply Chain Reliability Metrics
Analyze verifiable performance data: on-time delivery rates exceeding 95%, response times under 8 hours, and reorder rates above 20% indicate operational stability. Cross-reference online transaction volumes—suppliers with verified annual revenues above US $100,000 demonstrate consistent market demand and post-sales support capability. Confirm availability of third-party inspection coordination (e.g., SGS, BV) prior to shipment.
What Are the Best Devanti 2 in 1 Ice Maker Suppliers?
| Company Name | Location | Verified Type | On-Time Delivery | Response Time | Reorder Rate | Online Revenue | MOQ | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Ningbo Hicon Industry Technology Co., Ltd. | Zhejiang, CN | Custom Manufacturer | 66% | ≤8h | <15% | US $1,000+ | 50–100 units | $72–$100 |
| Jiangmen Youtai Machinery Equipment Co., Ltd. | Guangdong, CN | - | 97% | ≤4h | 26% | US $110,000+ | 1 case | $479–$1,149 |
| Shijiazhuang Daina Machinery Commerce Co., Ltd. | Hebei, CN | Multispecialty Supplier | 100% | ≤2h | 21% | US $360,000+ | 1 set | $480–$650 |
| Jiangmen Mingyi Refrigeration Equipment Co., Ltd. | Guangdong, CN | - | 96% | ≤4h | <15% | US $260,000+ | 1 case | $499–$2,429 |
| Guangzhou Chashimi Kitchen Equipment Co., Ltd. | Guangdong, CN | Multispecialty Supplier | 95% | ≤5h | <15% | US $160,000+ | 1–50 pieces | $100–$799 |
Performance Analysis
Shijiazhuang Daina leads in operational reliability with a 100% on-time delivery rate and sub-2-hour response time, supported by robust customization options for digital displays, tank materials, and branding. Jiangmen-based suppliers (Youtai and Mingyi) offer strong export volume and diversified product lines but vary in reorder performance—Youtai’s 26% reorder rate suggests higher customer retention, likely due to consistent quality in commercial-grade models. Ningbo Hicon provides entry-level pricing ideal for budget-conscious buyers, though its lower delivery reliability warrants enhanced contractual safeguards. Guangzhou Chashimi stands out for low MOQ flexibility, enabling small-scale testing at competitive unit costs. Prioritize suppliers with documented experience in food-safe materials and temperature-controlled packaging for cold chain integrity.
FAQs
How to verify devanti 2 in 1 ice maker supplier reliability?
Cross-check ISO 9001 certification status and request evidence of product-specific testing (e.g., CE EMC/LVD reports). Evaluate supplier responsiveness, order fulfillment history, and customization documentation. Conduct virtual factory audits to confirm production line controls and quality inspection checkpoints.
What is the typical sampling timeline?
Standard sample production takes 7–14 days, with express options available in 5–7 days. Add 5–10 days for international air shipping. Expect to pay 30–70% of unit cost for samples, often deductible from first bulk order.
Can suppliers accommodate custom voltage and plug types?
Yes, most suppliers listed offer customization for 110V/60Hz or 220V/50Hz systems and regional plug configurations (e.g., US, EU, AU). Confirm compatibility with local electrical codes and grounding requirements during specification finalization.
Do manufacturers support private labeling and packaging design?
Yes, all top-tier suppliers provide OEM services including custom logos, color schemes, user manuals, and retail box design. Minimum branding MOQs typically start at 50 units, with no additional fee for simple label integration.
What are common payment and logistics terms?
Standard terms include 30% T/T deposit, 70% before shipment. Trade Assurance or Letter of Credit options enhance transaction security. FOB terms are standard; suppliers typically coordinate with freight forwarders for CIF/C&F arrangements upon request. Sea freight is optimal for full-container loads (20ft or 40ft), while air freight suits urgent, low-volume shipments.









