headerSsrResult
Ad

Engine Control Module Programming

supplierLogo
Jinan Hongjing International Trade Co., Ltd.
Shandong, countryFlag CN
4.8/5
verifiedSupplier
3 yrs
60+
Matches 2/2 requirements
arrow
Warranty available
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
98%
Reorder rate
32%
Response time
≤1h
Online revenue
US $200,000+
Customization options
logo
packaging
label
1/16
supplierLogo factory
Wuxi Dingkuo Technology Co., Ltd
Jiangsu, countryFlag CN
4.8/5
verifiedSupplier
7 yrs
10+ staff
1,000+
Matches 2/2 requirements
arrow
#4 leading factory for Motors
CE ISO ROHS
Warranty available
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
99%
Reorder rate
16%
Response time
≤2h
Online revenue
US $360,000+
Customization options
color
material
size
logo
packaging
label
graphic
1/36
Live
supplierLogo
Guangzhou Shanjian Machinery Equipment Co., Ltd.
Guangdong, countryFlag CN
4.7/5
verifiedSupplier
13 yrs
120+
Matches 2/2 requirements
arrow
CE
Warranty available
Supplier assessment procedures
Full customization
ODM service available
Finished product inspection
On-time delivery
97%
Reorder rate
24%
Response time
≤3h
Online revenue
US $350,000+
Customization options
injection pump
color
excavator parts
parts list
bore range
weight
packaging
label
hydraulic
internal structure
material
size
bar length
rubber
logo
plug
graphic
boring bar
dimensions
1/14
supplierLogo
Xiangyang Share Sun Trading Co., Ltd.
Hubei Province, countryFlag CN
4.8/5
verifiedSupplier
1 yr
20+
Matches 2/2 requirements
arrow
Warranty available
Supplier assessment procedures
Finished product inspection
supplierLogo
Guangzhou Wansheng-Jision Technology Limited
Guangdong, countryFlag CN
4.4/5
11 yrs
Matches 2/2 requirements
arrow
On-time delivery
100%
Reorder rate
45%
Response time
≤3h
Online revenue
US $280,000+
Main products (number of listings)
Construction Machinery Parts
(4109)
Used Construction Machinery Parts
(2)
Other Electronic Accessories
(1)
Other Telecommunications Products
(1)
1/3
supplierLogo
Sukorun (Xiamen) M&E Co., Ltd.
Fujian, countryFlag CN
4.8/5
verifiedSupplier
17 yrs
10+ staff
150+
Matches 2/2 requirements
arrow
ISO
Warranty available
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
99%
Reorder rate
23%
Response time
≤1h
Online revenue
US $220,000+
Customization options
color
material
size
logo
packaging
label
graphic
1/13
supplierLogo
Guangdong Zetong Construction Machinery Co., Ltd.
Guangdong, countryFlag CN
4.6/5
3 yrs
Matches 2/2 requirements
arrow
On-time delivery
96%
Reorder rate
20%
Response time
≤3h
Online revenue
US $30,000+
Main products (number of listings)
Construction Machinery Parts
(555)
Telescope & Binoculars
(1)
Beakers
(1)
1/3
supplierLogo
Guangzhou Chaotian Construction Machinery Equipment Co., Ltd.
Guangdong, countryFlag CN
4.8/5
verifiedSupplier
6 yrs
10+ staff
380+
Matches 2/2 requirements
arrow
CE ROHS
Warranty available
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
100%
Reorder rate
31%
Response time
≤2h
Online revenue
US $1,000,000+
Customization options
size
logo
packaging
label
1/27
supplierLogo
Chang Sha Jin Cheng High Tech Machinery Co., Ltd.
Hunan, countryFlag CN
4.7/5
verifiedSupplier
13 yrs
240+
Matches 2/2 requirements
arrow
FCC
Warranty available
Full customization
Minor customization
ODM service available
On-time delivery
99%
Reorder rate
22%
Response time
≤3h
Online revenue
US $240,000+
Customization options
color
weight
packaging
label
windows
photos
material
size
drawings
wire harness
logo
programs
socket
graphic
1/2
supplierLogo
Jinan Victory Machinery Co.,ltd
Shandong, countryFlag CN
4.9/5
2 yrs
Matches 2/2 requirements
arrow
On-time delivery
90%
Reorder rate
21%
Response time
≤4h
Online revenue
US $70,000+
Main products (number of listings)
Injection Valves
(265)
Testing Equipment
(199)
Other Engine Parts
(124)
Other Truck Engine Parts
(47)
Common Rail Injector Tester
(32)
Truck Engine Assembly
(30)
1/3
supplierLogo
Guangzhou Borsen Technology Co., Ltd.
Guangdong, countryFlag CN
5.0/5
1 yr
Matches 2/2 requirements
arrow
On-time delivery
100%
Reorder rate
25%
Response time
≤1h
Online revenue
US $70,000+
Main products (number of listings)
PLC, PAC, & Dedicated Controllers
(832)
Input and Output(IO)
(53)
Control Cables
(49)
Other Industrial Components
(25)
Connectors
(18)
Variable Frequency Drivers
(17)
1/1
supplierLogo
Xi'an Jingcheng Jiayun Trading Co., Ltd.
Shaanxi, countryFlag CN
4.9/5
2 yrs
Matches 2/2 requirements
arrow
On-time delivery
93%
Reorder rate
<15%
Response time
≤2h
Online revenue
US $70,000+
Main products (number of listings)
Heavy Duty Vehicle Parts & Accessories
(51)
Construction Machinery Parts
(41)
Other Engine Parts
(25)
Other Truck Engine Parts
(18)
Truck Engine Assembly
(17)
Truck Wheels
(12)
1/3
supplierLogo
Hangzhou Wellco Mechanical & Electrical Co., Ltd.
Zhejiang, countryFlag CN
4.9/5
7 yrs
Matches 2/2 requirements
arrow
On-time delivery
100%
Reorder rate
24%
Response time
≤1h
Online revenue
US $220,000+
Main products (number of listings)
Other Engine Parts
(921)
Auto Sensors
(810)
Other Auto Parts
(726)
Auto Starter
(670)
Water Pumps
(535)
Fuel Pump & Parts
(493)
1/2
supplierLogo
Huachai Power Machinery (wuhan) Co., Ltd
Hubei, countryFlag CN
4.9/5
2 yrs
Matches 2/2 requirements
arrow
On-time delivery
100%
Reorder rate
25%
Response time
≤4h
Online revenue
US $6,000+
Main products (number of listings)
Machinery Engine Parts
(3782)
Machinery Engines
(18)
1/3
supplierLogo
Guangzhou original power trading limited
Guangdong, countryFlag CN
4.7/5
6 yrs
Matches 2/2 requirements
arrow
On-time delivery
98%
Reorder rate
35%
Response time
≤3h
Online revenue
US $200,000+
Main products (number of listings)
Machinery Engine Parts
(1216)
Construction Machinery Parts
(1154)
1/3
supplierLogo
Guangzhou Ratopparts Machinery Equipment Co., Ltd.
Guangdong, countryFlag CN
4.8/5
9 yrs
Matches 2/2 requirements
arrow
On-time delivery
92%
Reorder rate
24%
Response time
≤6h
Online revenue
US $150,000+
Main products (number of listings)
Construction Machinery Parts
(6817)
Pumps
(162)
Bucket
(7)
Other Construction Machinery Attachments
(4)
Seals
(3)
Hydraulic Breakers
(3)
1/3
supplierLogo
Guangzhou Juheyi Electronic Technology Co., Ltd.
Guangdong, countryFlag CN
5.0/5
1 yr
Matches 2/2 requirements
arrow
On-time delivery
100%
Reorder rate
42%
Response time
≤1h
Online revenue
US $80,000+
Main products (number of listings)
Other Machinery & Industrial Equipment
(495)
No supplier images available
0
supplierLogo
Guangzhou Yongli Engineering Machinery Equipment Co., Ltd.
Guangdong, countryFlag CN
4.8/5
3 yrs
Matches 2/2 requirements
arrow
On-time delivery
98%
Reorder rate
29%
Response time
≤2h
Online revenue
US $50,000+
Main products (number of listings)
Construction Machinery Parts
(3124)
1/1
supplierLogo
Hainan Zhongchai Import & Export Trading Co., Ltd.
Hainan Province, countryFlag CN
4.6/5
2 yrs
Matches 2/2 requirements
arrow
On-time delivery
100%
Reorder rate
15%
Response time
≤2h
Online revenue
US $20,000+
Main products (number of listings)
Injection Valves
(1259)
Other Engine Parts
(352)
Fuel Injection Pumps
(259)
Turbocharger & Parts
(145)
Other Truck Engine Parts
(127)
Spray Valves
(105)
1/3
supplierLogo
Quanzhou Taiwan Business Investment Zone Tick Electronic Firm (individual Business)
Fujian, countryFlag CN
4.6/5
1 yr
Matches 2/2 requirements
arrow
On-time delivery
85%
Reorder rate
28%
Response time
≤1h
Online revenue
US $20,000+
Main products (number of listings)
PLC, PAC, & Dedicated Controllers
(85865)
1/3

About engine control module programming

Where to Source Engine Control Module Programming Suppliers?

China remains the central hub for engine control module (ECM) programming solutions, with key supplier clusters concentrated in Shandong, Jiangsu, and Guangdong provinces. These regions host vertically integrated supply chains combining electronic component manufacturing, firmware development, and after-sales technical support. Shandong-based suppliers benefit from proximity to automotive logistics corridors, enabling faster domestic consolidation. Guangdong’s electronics ecosystem provides access to advanced PCB assembly and testing infrastructure, reducing production cycle times by 15–20% compared to non-specialized regions.

Suppliers in these zones operate within mature industrial networks where firmware engineers, hardware testers, and distribution partners collaborate within localized ecosystems. This integration supports rapid prototyping, batch customization, and scalable order fulfillment. Buyers can expect lead times of 7–14 days for programmed modules, with standard pricing ranging from $80–$600 depending on application complexity. The availability of reprogramming tools and OEM-equivalent calibration data further enhances sourcing efficiency for aftermarket and repair operations.

How to Evaluate Engine Control Module Programming Suppliers?

Procurement decisions should be guided by structured assessment criteria focusing on technical capability, operational reliability, and transaction security.

Technical Expertise & Compliance
Verify that suppliers demonstrate documented proficiency in OEM-specific programming protocols (e.g., Bosch, Delphi, Denso). While formal certifications such as ISO 9001 or IATF 16949 are not universally listed, consistent on-time delivery rates above 97% serve as a proxy for process discipline. For international buyers, confirm compatibility with regional emissions standards (e.g., Euro 6, EPA Tier 4) and diagnostic interfaces (OBD-II, J1939).

Production and Customization Capacity
Assess operational scale through measurable indicators:

  • Minimum order quantities (MOQs) typically range from 1–5 pieces, indicating flexibility for low-volume procurement
  • Customization capabilities including logo labeling, packaging design, and firmware version selection
  • Access to vehicle-specific calibration databases and flash programming tools
    Cross-reference product listings with response time metrics (target ≤2 hours) and reorder rates above 30% to identify suppliers with proven customer retention.

Transaction Risk Mitigation
Prioritize suppliers offering verifiable performance data, including confirmed online revenue streams and third-party transaction safeguards. Conduct sample testing to validate ECU functionality under real-world conditions—verify boot sequences, sensor signal processing, and error code handling before scaling orders. Use incremental payment terms tied to delivery milestones to minimize exposure.

Top Engine Control Module Programming Suppliers: Performance Overview

Company Name Location Online Revenue On-Time Delivery Avg. Response Reorder Rate Min. Order Price Range (USD) Customization Options
Jinan Hongjing International Trade Co., Ltd. Shandong, CN US $200,000+ 98% ≤1h 32% 2 pcs $81–$160 Logo, packaging label
Wuxi Dingkuo Technology Co., Ltd Jiangsu, CN US $360,000+ 99% ≤2h 16% 1 pc $11–$104 Color, material, size, logo, graphic
Guangzhou Shanjian Machinery Equipment Co., Ltd. Guangdong, CN US $350,000+ 97% ≤3h 24% 1 pc $330–$1,000 Injection pump, excavator parts, hydraulic components
Xiangyang Share Sun Trading Co., Ltd. Hubei, CN US $10,000+ 100% ≤2h <15% 1 pc $225–$795 Not specified
Guangzhou Wansheng-Jision Technology Limited Guangdong, CN US $280,000+ 100% ≤3h 45% 1 pc $500 Not specified

Performance Analysis
Jinan Hongjing offers competitive entry-level pricing ($81) and strong responsiveness (≤1h), making it suitable for small-scale buyers prioritizing communication speed. Wuxi Dingkuo stands out with extensive customization options and the lowest functional programming tool priced at $11, catering to integrators needing embedded controllers. Guangzhou Shanjian and Wansheng-Jision focus on high-value ECMs for construction and diesel engines, reflected in average prices exceeding $500. Notably, Xiangyang Share Sun and Guangzhou Wansheng-Jision achieve perfect 100% on-time delivery, indicating robust logistics execution despite varying reorder volumes. Buyers seeking long-term partnerships should prioritize suppliers with reorder rates above 30% and multi-point customization support to ensure adaptability across vehicle platforms.

FAQs

How to verify engine control module programming accuracy?

Request pre-shipment diagnostic reports showing successful flashing, VIN matching, and immobilizer deactivation. Validate against OEM service tools or third-party scan devices upon receipt. Test under simulated load conditions to confirm fuel mapping and throttle response integrity.

What is the typical lead time for programmed ECMs?

Standard orders are fulfilled within 5–10 business days. Complex calibrations requiring VIN-specific coding or anti-theft synchronization may extend to 14 days. Air shipping adds 5–7 days for international delivery.

Can suppliers provide ECMs for specific vehicle brands?

Yes, leading suppliers support major automotive and heavy-duty platforms including Cummins, Volvo, Caterpillar, and Bosch-managed systems. Confirm part number compatibility and firmware version availability prior to ordering.

Is customization available for branding or packaging?

Multiple suppliers offer OEM-style customization, including branded labels, color-coded housings, and tailored packaging. Minimum requirements vary—some allow single-unit personalization, while others require batches of 5 or more.

What are common risks when sourcing programmed ECMs?

Risks include incorrect calibration files, non-functional immobilizer resets, and counterfeit chips. Mitigate by sourcing from suppliers with verifiable transaction histories, demanding post-programming validation logs, and conducting incoming quality inspections using diagnostic software.