Factory Timer
CN
About factory timer
Where to Find Factory Timer Suppliers?
China remains the central hub for factory timer production, with specialized manufacturing clusters in Guangdong, Zhejiang, and Ningbo offering distinct competitive advantages. Shenzhen and Guangzhou in Guangdong province host advanced electronics and electromechanical facilities, supporting high-precision digital and programmable timers used in commercial, industrial, and kitchen environments. These regions benefit from mature supply chains for PCBs, relays, and plastic injection molding, reducing component lead times by 20–30% compared to non-specialized zones.
Ningbo and Shanghai serve as key centers for mechanical and appliance-grade timers, particularly for integration into washing machines, irrigation systems, and HVAC controls. The proximity to steel, copper, and polymer processing plants enables cost-efficient production of durable timer components. Suppliers in these clusters typically operate vertically integrated workflows—encompassing design, tooling, assembly, and packaging—allowing order fulfillment within 15–30 days for standard configurations. Economies of scale and localized sourcing contribute to 15–25% lower unit costs, making these regions ideal for both bulk procurement and customized development.
How to Choose Factory Timer Suppliers?
Selecting reliable suppliers requires a structured evaluation of technical capability, quality assurance, and transactional reliability:
Technical & Production Capabilities
Assess whether suppliers possess in-house engineering support for custom programming, housing design, or branding integration. Prioritize manufacturers with dedicated production lines for electronic, mechanical, or sand-based timers. Evidence of CNC machining, surface mount technology (SMT), or automated calibration indicates higher process control. For electromechanical models, verify compatibility with voltage standards (e.g., 110V/220V) and ingress protection ratings (IP65 for outdoor/wet environments).
Quality Management Systems
While formal ISO 9001 certification is not universally listed, consistent on-time delivery (≥90%) and repeat order rates (>20%) serve as operational proxies for quality discipline. Suppliers with documented testing protocols for cycle durability, contact resistance, and time accuracy are better positioned for long-term partnerships. For export-bound products, compliance with CE, RoHS, or UL standards should be confirmed through product-specific documentation.
Procurement Terms & Flexibility
Evaluate minimum order quantities (MOQs), pricing scalability, and customization scope:
- MOQs range from 1 piece (digital programmable units) to 500–1000 pieces (decorative or wooden sand timers)
- Unit prices vary significantly by type: $0.40–$1.30 for appliance timers, $3.99–$7.00 for digital switches, and $9–$19 for premium decorative or commercial models
- Customization options include color, material, logo imprinting, packaging, and functional adjustments (time duration, relay configuration)
Response time under 3 hours and reorder rates exceeding 20% correlate with higher service responsiveness and product satisfaction. Cross-reference online transaction volume (e.g., annual revenue tiers) as an indicator of market validation and logistical capacity.
What Are the Best Factory Timer Suppliers?
| Company Name | Main Product Focus | Price Range (USD) | Min. Order | On-Time Delivery | Avg. Response | Reorder Rate | Annual Online Revenue | Customization |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Aleo Home Crafts Co., Ltd. | Decorative Sand Timers | $1.42–$9.96 | 50–1000 pcs | 100% | ≤2h | 54% | US $360,000+ | Color, material, size, logo, packaging |
| Ningbo Boxi Garden Equipment Co., Ltd. | Garden Water Timers | $5.60–$11.00 | 2–20 pcs | 100% | ≤7h | <15% | US $60,000+ | Limited (model-specific) |
| Guangzhou Tianze Electromechanical Equipment Manufacturing Co., Ltd. | Commercial Digital Timers | $14.50–$19.50 | 1–2 pcs | 100% | ≤2h | <15% | US $1,000+ | Custom design, labeling, functionality |
| Ningbo Bufan Timer Manufacturing Co., Ltd. | Washing Machine Timers | $0.40–$1.30 | 100–1000 pcs | 100% | ≤18h | - | US $80+ | OEM-focused, component-level |
| Shanghai Pioneer Electrical Co., Ltd. | Digital Programmable Timers | $3.99–$4.15 | 1–10 pcs | 90% | ≤3h | 23% | US $130,000+ | Basic branding, socket integration |
Performance Analysis
Shenzhen Aleo stands out with the highest reorder rate (54%) and extensive customization capabilities, indicating strong buyer satisfaction in the decorative timer segment. Despite lower annual revenue, Guangzhou Tianze offers high-end commercial digital timers with single-piece MOQs and full design flexibility, suitable for niche or branded deployments. Ningbo Boxi and Shanghai Pioneer focus on electronic irrigation and programmable switches, respectively, with low MOQs and fast response times, making them viable for prototyping or small-batch orders. Ningbo Bufan specializes in high-volume mechanical timers for appliances, offering sub-dollar pricing at scale, though limited digital presence suggests a focus on B2B OEM contracts rather than direct export.
FAQs
How to verify factory timer supplier reliability?
Evaluate on-time delivery performance, response speed, and verifiable transaction volume. Request sample units to assess build quality, timing accuracy, and labeling consistency. Confirm whether the supplier provides technical drawings, compliance documentation, or warranty terms for electronic components.
What is the typical lead time for factory timer orders?
Standard orders are fulfilled within 15–25 days after confirmation. Custom designs may require an additional 10–15 days for tooling and prototype validation. Air shipping adds 5–7 days for international delivery; sea freight ranges from 25–40 days depending on destination.
Can suppliers provide timers with private labeling or custom packaging?
Yes, multiple suppliers offer logo printing, custom color housings, and tailored packaging. MOQs for branding typically start at 500 units, though some accept lower quantities for digital or high-value models.
Are samples available before bulk ordering?
Most suppliers offer samples, often at a slightly marked-up price, which may be credited toward first orders. Sample lead times average 5–10 days, with express shipping available.
What are common applications for factory-sourced timers?
Applications span commercial kitchens (cooking timers), industrial equipment (cycle controllers), home appliances (washing machine programs), irrigation systems (watering automation), and decorative uses (sand hourglasses). Select suppliers based on functional requirements—electronic precision vs. mechanical durability vs. aesthetic design.









